X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915100305000

Well Details

Well ID: 0915100305000
Loading map...
Location: 00/05-03-091-10W5/0
Location Alias: 00/05-03-91-10 W5M
Location Alias 2: 00/05-03-091-10 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 10
Section: 03
County/Municipality: Northern Sunrise County
Well Name: DOME CDA ET AL OGSTON 5-3-91-10
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0095030
License Date: 1982-02-10
License Status: RecCertified
Spud Date: 1982-03-09
Final Drill Date: 1982-03-26
Well Total Depth: 1495.50 m
Surface Hole Latitude: 56.862211
Surface Hole Longitude: -115.527561

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-02-10 Obtained License
1982-03-26 Finished Drilling
1982-03-27 Drill Stem Test Performed
1982-03-28 Liner Casing Operation Performed
1982-03-28 Well Mode changed to Drilled and Cased
1983-01-05 Perforation Treatment Performed - Jet Perforation
1983-02-03 Well Began Production
1983-02-03 Well Fluid changed to Crude Oil
1983-02-03 Well Mode changed to Pumping
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Suspended
1988-01-01 Well Fluid changed to Crude Oil
1988-01-01 Well Mode changed to Pumping
1988-01-10 Perforation Treatment Performed - Jet Perforation
1988-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Suspended
1989-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-29 Plug Back Performed
1989-03-29 Well Abandoned
1989-03-29 Well Fluid changed to Crude Oil
1989-03-29 Well Log Performed
1989-03-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-05 Perforation 1474.50 1476.00 13
1983-01-05 Perforation 1477.00 1477.50 0
1988-01-10 Perforation 1474.50 1476.00 13
1988-01-14 Acid Treatment 1474.50 1477.50 0
1989-03-29 Packing Device Capped w/Cement 1462.00 1470.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1675 0.0 0.0 0.0
1984 4654 0.0 0.0 0.0
1985 8333 0.0 0.0 0.0
1986 1056 0.0 0.0 0.0
1988 24 0.0 0.0 0.0
1989 24 0.0 0.0 0.0

For data sources see[5]

References