X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0906060202000

Well Details

Well ID: 0906060202000
Loading map...
Location: 00/02-02-090-06W6/0
Location Alias: 00/02-02-90-06 W6M
Location Alias 2: 00/02-02-090-06 W6/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 6
Range: 06
Section: 02
County/Municipality: Clear Hills County
Well Name: SYDCO CHARLIE 2-2-90-6
Operator Name: Sydco Energy Inc.
License Number: 0284692
License Date: 2003-03-20
License Status: Amended
Spud Date: 2003-03-23
Final Drill Date: 2003-12-08
Well Total Depth: 1295.00 m
Surface Hole Latitude: 56.772890
Surface Hole Longitude: -118.834418

For data sources see[1][2]

Well History

Date Event
2003-03-20 Obtained License
2003-03-23 Direction Drilling Operation Performed - Deviate
2003-03-24 Surface Casing Operation Performed
2003-12-08 Finished Drilling
2003-12-08 Well Log Performed
2003-12-08 Well Mode changed to Drilled and Cased
2003-12-09 Well Log Performed
2003-12-10 Production Casing Operation Performed
2003-12-10 Rig Released
2004-01-04 Perforation Treatment Performed - Jet Perforation
2004-01-04 Well Log Performed
2004-01-21 Well Began Production
2004-01-21 Well Fluid changed to Gas
2004-01-21 Well Mode changed to Flowing
2005-02-13 Perforation Treatment Performed - Jet Perforation
2005-02-13 Well Log Performed
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Suspended
2020-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-29 Plug Back Performed
2020-01-29 Well Fluid changed to Gas
2020-01-29 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-03-23 750.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-04 Perforation 1162.80 1163.40 11
2005-02-13 Perforation 1165.20 1167.70 17
2005-02-13 Perforation 1158.70 1162.70 17
2020-01-29 Packing Device Capped w/Cement 1140.00 1148.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 8270 0.0 0.0 0.0
2005 6833 0.0 0.0 0.0
2006 7660 0.0 0.0 0.0
2007 4327 0.0 0.0 0.0
2008 6664 0.0 0.0 0.0
2009 8756 0.0 0.0 0.0
2010 8749 0.0 0.0 0.0
2011 8594 0.0 0.0 0.0
2012 2853 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References