X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0906042213000

Well Details

Well ID: 0906042213000
Loading map...
Location: 00/13-22-090-04W6/0
Location Alias: 00/13-22-90-04 W6M
Location Alias 2: 00/13-22-090-04 W6/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 6
Range: 04
Section: 22
County/Municipality: Clear Hills County
Well Name: SYDCO COLORADO 13-22-90-4
Operator Name: Sydco Energy Inc.
License Number: 0217750
License Date: 1998-09-23
License Status: Suspension
Spud Date: 1998-09-30
Final Drill Date: 1998-10-02
Well Total Depth: 1030.00 m
Surface Hole Latitude: 56.825213
Surface Hole Longitude: -118.553722

For data sources see[1][2]

Well History

Date Event
1998-09-23 Obtained License
1998-09-30 Well Log Performed
1998-10-01 Surface Casing Operation Performed
1998-10-02 Finished Drilling
1998-10-02 Well Mode changed to Drilled and Cased
1998-10-03 Production Casing Operation Performed
1998-10-03 Rig Released
1998-10-03 Well Log Performed
1998-10-31 Perforation Treatment Performed - Jet Perforation
1998-10-31 Well Log Performed
1998-11-08 Well Began Production
1998-11-08 Well Fluid changed to Gas
1998-11-08 Well Mode changed to Flowing
2004-01-11 Well Log Performed
2009-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-12-01 Well Fluid changed to Gas
2014-12-01 Well Mode changed to Suspended
2020-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-04 Plug Back Performed
2020-02-04 Well Fluid changed to Gas
2020-02-04 Well Log Performed
2020-02-04 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-31 Perforation 938.00 941.00 20
1998-10-31 Perforation 942.00 943.00 20
2009-03-10 Acid Treatment 942.00 943.00 0
2009-03-10 Acid Treatment 938.00 941.00 0
2010-01-30 Acid Treatment 938.00 941.00 0
2010-01-30 Acid Treatment 942.00 943.00 0
2020-02-04 Packing Device Capped w/Cement 920.00 928.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1087 0.0 0.0 0.0
1999 8256 0.0 0.0 0.0
2000 8739 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8644 0.0 0.0 0.0
2003 8676 0.0 0.0 0.0
2004 8754 0.0 0.0 0.0
2005 8445 0.0 0.0 0.0
2006 8090 0.0 0.0 0.0
2007 8526 0.0 0.0 0.0
2008 8493 0.0 0.0 0.0
2009 8501 0.0 0.0 0.0
2010 8582 0.0 0.0 0.0
2011 8334 0.0 0.0 0.0
2012 2810 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References