X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905051610000

Well Details

Well ID: 0905051610000
Loading map...
Location: 00/10-16-090-05W5/0
Location Alias: 00/10-16-90-05 W5M
Location Alias 2: 00/10-16-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 16
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 10-16-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0146723
License Date: 1990-12-05
License Status: Amended
Spud Date: 1990-12-07
Final Drill Date: 1991-01-10
Well Total Depth: 1684.00 m
Surface Hole Latitude: 56.810075
Surface Hole Longitude: -114.719743

For data sources see[1][2]

Well History

Date Event
1990-12-05 Obtained License
1990-12-07 Well Log Performed
1990-12-08 Direction Drilling Operation Performed - Deviate
1990-12-12 Surface Casing Operation Performed
1990-12-13 Lost Circulation Occurred
1990-12-24 Intermediate Casing Operation Performed
1991-01-10 Finished Drilling
1991-01-10 Well Mode changed to Drilled and Cased
1991-01-11 Well Log Performed
1991-01-13 Production Casing Operation Performed
1991-01-13 Rig Released
1991-01-24 Perforation Treatment Performed - Jet Perforation
1991-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-07 Well Began Production
1991-02-07 Well Fluid changed to Crude Oil
1991-02-07 Well Mode changed to Pumping
1991-04-22 Well Log Performed
1994-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-28 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-08 236.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-24 Perforation 1642.50 1643.00 13
1991-01-24 Perforation 1643.80 1645.80 13
1991-01-25 Acid Treatment 1642.50 1645.80 0
1994-06-23 Acid Treatment 1642.50 1645.80 0
2001-09-28 Chemical Squeeze 1642.50 1645.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 6549 0.0 0.0 0.0
1992 8452 0.0 0.0 0.0
1993 7697 0.0 0.0 0.0
1994 7401 0.0 0.0 0.0
1995 7186 0.0 0.0 0.0
1996 8544 0.0 0.0 0.0
1997 8313 0.0 0.0 0.0
1998 8719 0.0 0.0 0.0
1999 8661 0.0 0.0 0.0
2000 8765 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8726 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8630 0.0 0.0 0.0
2005 8562 0.0 0.0 0.0
2006 8719 0.0 0.0 0.0
2007 8599 0.0 0.0 0.0
2008 8605 0.0 0.0 0.0
2009 2582 0.0 0.0 0.0
2011 7241 0.0 0.0 0.0
2012 5233 0.0 0.0 0.0
2013 8619 0.0 0.0 0.0
2014 7839 0.0 0.0 0.0
2015 8692 0.0 0.0 0.0
2016 8571 0.0 0.0 0.0
2017 7279 0.0 0.0 0.0
2018 7945 0.0 0.0 0.0
2019 8236 0.0 0.0 0.0
2020 1944 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-12-13 Lost Circulation 649.00 676.00

For data sources see[7]

References