X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905030302000

Well Details

Well ID: 0905030302000
Loading map...
Location: 00/02-03-090-03W5/0
Location Alias: 00/02-03-90-03 W5M
Location Alias 2: 00/02-03-090-03 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 03
Section: 03
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED TROUT 2-3-90-3
Operator Name: Highwood Oil Company Ltd.
License Number: 0153324
License Date: 1992-08-04
License Status: Suspension
Spud Date: 1992-08-18
Final Drill Date: 1992-08-25
Well Total Depth: 1480.00 m
Surface Hole Latitude: 56.771832
Surface Hole Longitude: -114.384363

For data sources see[1][2]

Well History

Date Event
1992-08-04 Obtained License
1992-08-20 Surface Casing Operation Performed
1992-08-20 Well Log Performed
1992-08-23 Intermediate Casing Operation Performed
1992-08-25 Finished Drilling
1992-08-25 Well Log Performed
1992-08-25 Well Mode changed to Drilled and Cased
1992-08-27 Production Casing Operation Performed
1992-08-27 Rig Released
1992-10-16 Well Log Performed
1992-10-17 Perforation Treatment Performed - Jet Perforation
1992-10-17 Well Log Performed
1992-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-16 Well Began Production
1992-11-16 Well Fluid changed to Crude Oil
1992-11-16 Well Mode changed to Pumping
1993-01-05 Well Log Performed
1995-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-06 Perforation Treatment Performed - Chemical Squeeze
1997-12-01 Perforation Treatment Performed - Chemical Squeeze
2019-04-01 Well Fluid changed to Crude Oil
2019-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-10-17 Perforation 1444.50 1448.30 13
1997-12-01 Chemical Squeeze 1444.50 1460.30 0
1992-10-17 Perforation 1450.00 1451.50 13
1992-10-17 Perforation 1452.50 1455.00 13
1992-10-17 Perforation 1456.00 1457.80 13
1992-10-17 Perforation 1458.50 1460.30 13
1992-10-18 Acid Treatment 1444.50 1460.30 0
1992-10-19 Acid Treatment 1444.50 1460.30 0
1995-12-14 Acid Treatment 1444.50 1460.30 0
1997-11-06 Chemical Squeeze 1444.50 1460.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1096 0.0 0.0 0.0
1993 8463 0.0 0.0 0.0
1994 8410 0.0 0.0 0.0
1995 7900 0.0 0.0 0.0
1996 8020 0.0 0.0 0.0
1997 8019 0.0 0.0 0.0
1998 8342 0.0 0.0 0.0
1999 8494 0.0 0.0 0.0
2000 8727 0.0 0.0 0.0
2001 8674 0.0 0.0 0.0
2002 8640 0.0 0.0 0.0
2003 8383 0.0 0.0 0.0
2004 8539 0.0 0.0 0.0
2005 8333 0.0 0.0 0.0
2006 8595 0.0 0.0 0.0
2007 8517 0.0 0.0 0.0
2008 8644 0.0 0.0 0.0
2009 8467 0.0 0.0 0.0
2010 8566 0.0 0.0 0.0
2011 8614 0.0 0.0 0.0
2012 4237 0.0 0.0 0.0
2013 8463 0.0 0.0 0.0
2014 8085 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 1344 0.0 0.0 0.0

For data sources see[5]

References