X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0896050716000

Well Details

Well ID: 0896050716000
Loading map...
Location: 00/16-07-089-05W6/0
Location Alias: 00/16-07-89-05 W6M
Location Alias 2: 00/16-07-089-05 W6/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 6
Range: 05
Section: 07
County/Municipality: Clear Hills County
Well Name: SYDCO CHARLIE 16-7-89-5
Operator Name: Sydco Energy Inc.
License Number: 0223973
License Date: 1999-06-24
License Status: Suspension
Spud Date: 1999-07-03
Final Drill Date: 1999-07-06
Well Total Depth: 1173.00 m
Surface Hole Latitude: 56.708443
Surface Hole Longitude: -118.778153

For data sources see[1][2]

Well History

Date Event
1999-06-24 Obtained License
1999-07-03 Surface Casing Operation Performed
1999-07-06 Finished Drilling
1999-07-06 Production Casing Operation Performed
1999-07-06 Well Log Performed
1999-07-07 Rig Released
1999-07-07 Well Mode changed to Drilled and Cased
1999-07-09 Perforation Treatment Performed - Jet Perforation
1999-07-09 Well Log Performed
1999-07-10 Perforation Treatment Performed - Jet Perforation
1999-07-10 Well Log Performed
1999-07-10 Well Mode changed to Drilled and Cased
1999-07-18 Well Began Production
1999-07-18 Well Fluid changed to Gas
1999-07-18 Well Mode changed to Flowing
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Suspended
2020-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-25 Plug Back Performed
2020-01-25 Well Fluid changed to Gas
2020-01-25 Well Mode changed to Abandoned Zone
2020-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-26 Plug Back Performed
2020-01-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-07-09 Perforation 1145.00 1146.50 14
1999-07-10 Perforation 1099.00 1101.00 14
1999-07-10 Perforation 1095.50 1096.50 14
2020-01-25 Packing Device Capped w/Cement 1122.00 1130.00 0
2020-01-26 Packing Device Capped w/Cement 1077.00 1085.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3858 0.0 0.0 0.0
2000 5471 0.0 0.0 0.0
2001 8329 0.0 0.0 0.0
2002 8740 0.0 0.0 0.0
2003 8574 0.0 0.0 0.0
2004 8371 0.0 0.0 0.0
2005 8489 0.0 0.0 0.0
2006 8046 0.0 0.0 0.0
2007 8375 0.0 0.0 0.0
2008 8612 0.0 0.0 0.0
2009 3886 0.0 0.0 0.0
2010 8573 0.0 0.0 0.0
2011 8506 0.0 0.0 0.0
2012 165 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References