X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895092210000

Well Details

Well ID: 0895092210000
Loading map...
Location: 00/10-22-089-09W5/0
Location Alias: 00/10-22-89-09 W5M
Location Alias 2: 00/10-22-089-09 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 09
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: DORSET RED EARTH 10-22-89-9
Operator Name: Baytex Energy Ltd.
License Number: 0186490
License Date: 1996-03-01
License Status: Abandoned
Spud Date: 1996-03-06
Final Drill Date: 1996-03-14
Well Total Depth: 1435.00 m
Surface Hole Latitude: 56.736417
Surface Hole Longitude: -115.338076

For data sources see[1][2]

Well History

Date Event
1996-03-01 Obtained License
1996-03-06 Well Log Performed
1996-03-07 Surface Casing Operation Performed
1996-03-08 Lost Circulation Occurred
1996-03-11 Intermediate Casing Operation Performed
1996-03-14 Finished Drilling
1996-03-14 Kick Occurred
1996-03-14 Well Mode changed to Drilled and Cased
1996-03-15 Liner Casing Operation Performed
1996-03-15 Rig Released
1996-03-15 Well Log Performed
1996-03-23 Perforation Treatment Performed - Jet Perforation
1996-03-24 Perforation Treatment Performed - Jet Perforation
1996-03-26 Well Began Production
1996-03-26 Well Fluid changed to Crude Oil
1996-03-26 Well Mode changed to Flowing
1996-06-12 Well Log Performed
1996-10-26 Well Fluid changed to Crude Oil
1996-10-26 Well Mode changed to Pumping
1999-09-30 Well Fluid changed to Crude Oil
1999-09-30 Well Mode changed to Suspended
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Pumping
2000-09-30 Well Fluid changed to Crude Oil
2000-09-30 Well Mode changed to Suspended
2000-10-17 Well Log Performed
2004-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-20 Perforation Treatment Performed - Cement Plug
2004-11-20 Plug Back Performed
2004-11-20 Well Fluid changed to Crude Oil
2004-11-20 Well Mode changed to Abandoned Zone
2004-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-06 Well Abandoned
2005-02-06 Well Fluid changed to Crude Oil
2005-02-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-23 Perforation 1414.00 1416.00 13
1996-03-24 Perforation 1407.50 1411.50 13
2004-11-20 Packing Device Capped w/Cement 1380.00 1396.00 0
2004-11-20 Cement Plug 1068.50 1102.00 0
2004-11-21 Packing Device Capped w/Cement 807.00 815.00 0
2004-11-21 Packing Device Capped w/Cement 342.00 350.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5243 0.0 0.0 0.0
1997 8199 0.0 0.0 0.0
1998 7722 0.0 0.0 0.0
1999 1732 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-03-08 Lost Circulation 457.00 519.00
1996-03-14 Kick 1435.00 1435.00

For data sources see[6]

References