X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895081009002

Well Details

Well ID: 0895081009002
Loading map...
Location: 00/09-10-089-08W5/2
Location Alias: 00/09-10-89-08 W5M
Location Alias 2: 00/09-10-089-08 W5/02
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 08
Section: 10
County/Municipality: Municipal District of Opportunity No. 17
Well Name: ATAPCO COASTAL REDEARTH 9-10-89-8
Operator Name: Bonavista Energy Corporation
License Number: 0087155
License Date: 1980-11-19
License Status: Re-Entered
Spud Date: 1980-12-03
Final Drill Date: 1981-01-04
Well Total Depth: 1467.00 m
Surface Hole Latitude: 56.706660
Surface Hole Longitude: -115.177139

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-19 Obtained License
1980-12-10 Drill Stem Test Performed
1980-12-11 Lost Circulation Occurred
1980-12-14 Lost Circulation Occurred
1980-12-31 Drill Stem Test Performed
1981-01-04 Finished Drilling
1981-01-04 Well Mode changed to Drilled and Cased
1981-01-05 Drill Stem Test Performed
1981-01-06 Liner Casing Operation Performed
1981-02-11 Perforation Treatment Performed - Jet Perforation
1981-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-02 Perforation Treatment Performed - Jet Perforation
1981-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-10 Well Began Production
1981-09-10 Well Fluid changed to Crude Oil
1981-09-10 Well Mode changed to Flowing
1981-10-01 Well Fluid changed to Crude Oil
1981-10-01 Well Mode changed to Suspended
1985-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-06 Perforation Treatment Performed - Cement Squeeze
1985-09-06 Perforation Treatment Performed - Jet Perforation
1985-09-08 Perforation Treatment Performed - Jet Perforation
1985-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-17 Perforation Treatment Performed - Cement Squeeze
1999-07-17 Plug Back Performed
1999-07-17 Well Fluid changed to Crude Oil
1999-07-17 Well Mode changed to Abandoned and Re-entered
1999-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-11 Perforation 1401.00 1406.00 13
1985-09-09 Acid Treatment 1243.50 1244.50 0
1999-07-17 Cement Squeeze 1243.50 1244.50 0
1981-02-12 Acid Treatment 1401.00 1406.00 0
1981-09-01 Packing Device Capped w/Cement 1390.00 1390.00 0
1981-09-02 Perforation 1243.50 1244.50 13
1981-09-03 Acid Treatment 1243.50 1244.50 0
1985-09-06 Perforation 1260.00 1261.00 13
1985-09-06 Acid Treatment 1260.00 1261.00 0
1985-09-06 Cement Squeeze 1243.50 1261.00 0
1985-09-08 Perforation 1243.50 1244.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 255 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-12-11 Lost Circulation 458.00 630.00
1980-12-14 Lost Circulation 985.00 1180.00

For data sources see[6]

References