X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895053014000

Well Details

Well ID: 0895053014000
Loading map...
Location: 00/14-30-089-05W5/0
Location Alias: 00/14-30-89-05 W5M
Location Alias 2: 00/14-30-089-05 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 05
Section: 30
County/Municipality: Municipal District of Opportunity No. 17
Well Name: KOCH OS OPER. 100 KIDNEY 14-30-89-5
Operator Name: Paramount Resources Ltd.
License Number: 0471240
License Date: 2014-11-07
License Status: Suspension
Spud Date: 2014-12-04
Final Drill Date: 2015-01-06
Well Total Depth: 1573.00 m
Surface Hole Latitude: 56.751880
Surface Hole Longitude: -114.789299

For data sources see[1][2]

Well History

Date Event
2014-11-07 Obtained License
2014-11-25 Conductor Casing Operation Performed
2014-12-11 Surface Casing Operation Performed
2014-12-13 Well Log Performed
2014-12-14 Lost Circulation Occurred
2014-12-24 Intermediate Casing Operation Performed
2015-01-02 Direction Drilling Operation Performed - Deviate
2015-01-06 Finished Drilling
2015-01-06 Well Log Performed
2015-01-06 Well Mode changed to Drilled and Cased
2015-01-07 Production Casing Operation Performed
2015-01-07 Rig Released
2015-02-08 Perforation Treatment Performed - Jet Perforation
2015-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-08-10 Well Began Production
2015-08-10 Well Fluid changed to Crude Oil
2015-08-10 Well Mode changed to Pumping
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-04 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-02 1262.30 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-08 Perforation 1526.50 1536.50 17
2015-02-10 Acid Treatment 1526.50 1536.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2876 0.0 0.0 0.0
2016 96 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 Lost Circulation 620.00 620.00
2015-02-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References