X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886102308020

Well Details

Well ID: 0886102308020
Loading map...
Location: 02/08-23-088-10W6/0
Location Alias: 02/08-23-88-10 W6M
Location Alias 2: 02/08-23-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 23
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF HZ 102 WORSLEY 8-23-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0422642
License Date: 2010-08-13
License Status: Issued
Spud Date: 2010-08-30
Final Drill Date: 2010-09-14
Well Total Depth: 3189.00 m
Surface Hole Latitude: 56.643293
Surface Hole Longitude: -119.498360

For data sources see[1][2]

Well History

Date Event
2010-08-13 Obtained License
2010-08-31 Surface Casing Operation Performed
2010-09-02 Direction Drilling Operation Performed - Horizontal
2010-09-02 Well Log Performed
2010-09-06 Intermediate Casing Operation Performed
2010-09-14 Finished Drilling
2010-09-14 Well Mode changed to Drilled and Cased
2010-09-16 Liner Casing Operation Performed
2010-09-17 Rig Released
2010-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-29 Perforation Treatment Performed - Open-Hole Completion
2010-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-16 Well Began Production
2010-10-16 Well Fluid changed to Crude Oil
2010-10-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-02 955.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-29 Open Hole/Barefoot Completion 3115.00 3189.00 0
2010-09-29 Multi-Stage Fracture 2152.70 2153.50 0
2010-09-30 Multi-Stage Fracture 2023.60 2024.40 0
2010-09-30 Multi-Stage Fracture 1906.30 1907.10 0
2010-09-30 Multi-Stage Fracture 1789.50 1790.30 0
2010-09-30 Multi-Stage Fracture 1672.50 1673.30 0
2010-09-29 Multi-Stage Fracture 3110.00 3110.80 0
2010-09-29 Multi-Stage Fracture 2993.50 2994.30 0
2010-09-29 Multi-Stage Fracture 2876.30 2877.10 0
2010-09-29 Multi-Stage Fracture 2746.10 2746.90 0
2010-09-29 Multi-Stage Fracture 2624.90 2625.60 0
2010-09-29 Multi-Stage Fracture 2509.00 2509.80 0
2010-09-29 Multi-Stage Fracture 2394.20 2395.00 0
2010-09-29 Multi-Stage Fracture 2266.10 2266.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1852 0.0 0.0 0.0
2011 6920 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8256 0.0 0.0 0.0
2014 8437 0.0 0.0 0.0
2015 8091 0.0 0.0 0.0
2016 6517 0.0 0.0 0.0
2017 6982 0.0 0.0 0.0
2018 8557 0.0 0.0 0.0
2019 8468 0.0 0.0 0.0
2020 2099 0.0 0.0 0.0

For data sources see[6]

References