X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886102304000

Well Details

Well ID: 0886102304000
Loading map...
Location: 00/04-23-088-10W6/0
Location Alias: 00/04-23-88-10 W6M
Location Alias 2: 00/04-23-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 23
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 1-21HZ WORSLEY 4-23-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0446907
License Date: 2012-06-27
License Status: Issued
Spud Date: 2012-08-21
Final Drill Date: 2012-09-03
Well Total Depth: 3090.00 m
Surface Hole Latitude: 56.640513
Surface Hole Longitude: -119.518630

For data sources see[1][2]

Well History

Date Event
2012-06-27 Obtained License
2012-08-22 Surface Casing Operation Performed
2012-08-25 Direction Drilling Operation Performed - Deviate
2012-08-26 Direction Drilling Operation Performed - Horizontal
2012-08-27 Intermediate Casing Operation Performed
2012-08-28 Well Log Performed
2012-09-03 Finished Drilling
2012-09-03 Well Mode changed to Drilled and Cased
2012-09-04 Liner Casing Operation Performed
2012-09-05 Rig Released
2012-09-06 Well Began Production
2012-09-06 Well Fluid changed to Crude Oil
2012-09-06 Well Mode changed to Pumping
2012-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-13 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-21 Excalibur Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-25 1009.00 Deviate (5 - 79 degrees)
2012-08-26 1402.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-13 Open Hole/Barefoot Completion 3077.00 3090.00 0
2012-09-13 Multi-Stage Fracture 2217.70 2218.50 0
2012-09-13 Multi-Stage Fracture 2118.30 2119.10 0
2012-09-13 Multi-Stage Fracture 2005.50 2006.30 0
2012-09-13 Multi-Stage Fracture 1906.00 1906.80 0
2012-09-13 Multi-Stage Fracture 1810.50 1811.30 0
2012-09-13 Multi-Stage Fracture 1706.30 1707.10 0
2012-09-13 Multi-Stage Fracture 1605.40 1606.20 0
2012-09-13 Multi-Stage Fracture 1516.10 1516.90 0
2012-09-13 Multi-Stage Fracture 3014.40 3015.20 0
2012-09-13 Multi-Stage Fracture 2913.20 2914.10 0
2012-09-13 Multi-Stage Fracture 2813.70 2814.50 0
2012-09-13 Multi-Stage Fracture 2714.10 2714.90 0
2012-09-13 Multi-Stage Fracture 2614.70 2615.50 0
2012-09-13 Multi-Stage Fracture 2516.00 2516.80 0
2012-09-13 Multi-Stage Fracture 2416.40 2417.20 0
2012-09-13 Multi-Stage Fracture 2317.30 2318.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1956 0.0 0.0 0.0
2013 5645 0.0 0.0 0.0
2014 8179 0.0 0.0 0.0
2015 8337 0.0 0.0 0.0
2016 5771 0.0 0.0 0.0
2017 6844 0.0 0.0 0.0
2018 6711 0.0 0.0 0.0
2019 8413 0.0 0.0 0.0
2020 2047 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-05 No Incident Encountered 0.00 0.00
2012-10-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References