If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886100913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.621458,"lon":-119.516652,"icon":""}]} |
Location: 00/13-09-088-10W6/0 | |
Location Alias: 00/13-09-88-10 W6M | |
Location Alias 2: 00/13-09-088-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 10 | |
Section: 09 | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF HZ CLEARH 13-9-88-10 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0435619 | |
License Date: 2011-07-28 | |
License Status: Issued | |
Spud Date: 2011-08-13 | |
Final Drill Date: 2011-08-26 | |
Well Total Depth: 2568.00 m | |
Surface Hole Latitude: 56.621458 | |
Surface Hole Longitude: -119.516652 |
Date | Event |
---|---|
2011-07-28 | Obtained License |
2011-08-14 | Surface Casing Operation Performed |
2011-08-15 | Direction Drilling Operation Performed - Horizontal |
2011-08-15 | Well Log Performed |
2011-08-16 | Well Log Performed |
2011-08-21 | Intermediate Casing Operation Performed |
2011-08-26 | Finished Drilling |
2011-08-26 | Well Mode changed to Drilled and Cased |
2011-08-27 | Liner Casing Operation Performed |
2011-08-28 | Rig Released |
2011-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-22 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-23 | Well Began Production |
2011-10-23 | Well Fluid changed to Crude Oil |
2011-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-15 | 703.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-22 | Multi-Stage Fracture | 2538.50 | 2539.30 | 0 |
2011-09-22 | Multi-Stage Fracture | 1821.40 | 1822.20 | 0 |
2011-09-22 | Multi-Stage Fracture | 1743.30 | 1744.10 | 0 |
2011-09-22 | Multi-Stage Fracture | 1665.70 | 1666.50 | 0 |
2011-09-22 | Multi-Stage Fracture | 1575.70 | 1576.50 | 0 |
2011-09-22 | Multi-Stage Fracture | 1497.80 | 1498.60 | 0 |
2011-09-22 | Multi-Stage Fracture | 1420.00 | 1420.80 | 0 |
2011-09-22 | Open Hole/Barefoot Completion | 2555.00 | 2568.00 | 0 |
2011-09-22 | Multi-Stage Fracture | 2447.90 | 2448.70 | 0 |
2011-09-22 | Multi-Stage Fracture | 2381.60 | 2382.40 | 0 |
2011-09-22 | Multi-Stage Fracture | 2303.50 | 2304.30 | 0 |
2011-09-22 | Multi-Stage Fracture | 2224.70 | 2225.50 | 0 |
2011-09-22 | Multi-Stage Fracture | 2146.40 | 2147.20 | 0 |
2011-09-22 | Multi-Stage Fracture | 2056.00 | 2056.80 | 0 |
2011-09-22 | Multi-Stage Fracture | 1977.90 | 1978.70 | 0 |
2011-09-22 | Multi-Stage Fracture | 1900.00 | 1900.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1645 | 0.0 | 0.0 | 0.0 |
2012 | 7897 | 0.0 | 0.0 | 0.0 |
2013 | 7610 | 0.0 | 0.0 | 0.0 |
2014 | 8522 | 0.0 | 0.0 | 0.0 |
2015 | 8145 | 0.0 | 0.0 | 0.0 |
2016 | 8362 | 0.0 | 0.0 | 0.0 |
2017 | 8450 | 0.0 | 0.0 | 0.0 |
2018 | 8129 | 0.0 | 0.0 | 0.0 |
2019 | 8241 | 0.0 | 0.0 | 0.0 |
2020 | 2080 | 0.0 | 0.0 | 0.0 |
For data sources see[6]