X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886100905002

Well Details

Well ID: 0886100905002
Loading map...
Location: 00/05-09-088-10W6/2
Location Alias: 00/05-09-88-10 W6M
Location Alias 2: 00/05-09-088-10 W6/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 09
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 8-9 HZ WORSLEY 5-9-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0446912
License Date: 2012-06-27
License Status: Amended
Spud Date: 2012-07-22
Final Drill Date: 2012-08-04
Well Total Depth: 2501.00 m
Surface Hole Latitude: 56.614575
Surface Hole Longitude: -119.518946

For data sources see[1][2]

Well History

Date Event
2012-06-27 Obtained License
2012-07-23 Surface Casing Operation Performed
2012-07-28 Direction Drilling Operation Performed - Deviate
2012-07-29 Direction Drilling Operation Performed - Horizontal
2012-07-30 Intermediate Casing Operation Performed
2012-08-04 Finished Drilling
2012-08-04 Well Mode changed to Drilled and Cased
2012-08-06 Liner Casing Operation Performed
2012-08-06 Rig Released
2012-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-28 Perforation Treatment Performed - Open-Hole Completion
2012-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-23 Well Began Production
2012-09-23 Well Fluid changed to Crude Oil
2012-09-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-07-28 834.50 Deviate (5 - 79 degrees)
2012-07-29 1202.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-28 Open Hole/Barefoot Completion 2195.00 2501.00 0
2012-08-29 Multi-Stage Fracture 1695.00 1695.80 0
2012-08-29 Multi-Stage Fracture 1568.50 1569.30 0
2012-08-29 Multi-Stage Fracture 1469.10 1469.90 0
2012-08-29 Multi-Stage Fracture 1369.40 1370.20 0
2012-08-29 Multi-Stage Fracture 1297.20 1298.00 0
2012-08-28 Multi-Stage Fracture 2489.70 2490.50 0
2012-08-28 Multi-Stage Fracture 2390.00 2390.80 0
2012-08-28 Multi-Stage Fracture 2290.60 2291.40 0
2012-08-28 Multi-Stage Fracture 2191.40 2192.20 0
2012-08-28 Multi-Stage Fracture 2092.20 2093.00 0
2012-08-28 Multi-Stage Fracture 1993.00 1993.80 0
2012-08-29 Multi-Stage Fracture 1893.70 1894.50 0
2012-08-29 Multi-Stage Fracture 1794.00 1794.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2084 0.0 0.0 0.0
2013 7483 0.0 0.0 0.0
2014 8261 0.0 0.0 0.0
2015 8128 0.0 0.0 0.0
2016 8251 0.0 0.0 0.0
2017 8136 0.0 0.0 0.0
2018 8294 0.0 0.0 0.0
2019 8480 0.0 0.0 0.0
2020 2119 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-06 No Incident Encountered 0.00 0.00
2012-09-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References