X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886091914000

Well Details

Well ID: 0886091914000
Loading map...
Location: 00/14-19-088-09W6/0
Location Alias: 00/14-19-88-09 W6M
Location Alias 2: 00/14-19-088-09 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 09
Section: 19
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 16-23H WORSLEY 14-19-88-9
Operator Name: Enercapita Energy Ltd.
License Number: 0430399
License Date: 2011-01-21
License Status: Amended
Spud Date: 2011-01-24
Final Drill Date: 2011-02-08
Well Total Depth: 3510.00 m
Surface Hole Latitude: 56.651704
Surface Hole Longitude: -119.466269

For data sources see[1][2]

Well History

Date Event
2011-01-21 Obtained License
2011-01-25 Surface Casing Operation Performed
2011-01-27 Direction Drilling Operation Performed - Horizontal
2011-01-29 Production Casing Operation Performed
2011-01-30 Well Log Performed
2011-02-08 Finished Drilling
2011-02-08 Well Mode changed to Drilled and Cased
2011-02-09 Liner Casing Operation Performed
2011-02-10 Rig Released
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-24 Perforation Treatment Performed - Jet Perforation
2011-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-26 Well Began Production
2011-03-26 Well Fluid changed to Crude Oil
2011-03-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-27 1100.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-23 Perforation 3480.50 3481.30 6
2011-02-23 Multi-Stage Fracture 2953.40 2954.20 0
2011-02-23 Perforation 2825.70 2826.50 6
2011-02-23 Multi-Stage Fracture 2825.70 2826.50 0
2011-02-23 Perforation 2649.30 2650.10 6
2011-02-23 Multi-Stage Fracture 2649.30 2650.10 0
2011-02-23 Perforation 2521.60 2522.40 6
2011-02-23 Multi-Stage Fracture 2521.60 2522.40 0
2011-02-23 Perforation 2371.80 2372.60 6
2011-02-23 Multi-Stage Fracture 2371.80 2372.60 0
2011-02-24 Perforation 2293.40 2294.20 6
2011-02-23 Multi-Stage Fracture 3480.50 3481.30 0
2011-02-24 Multi-Stage Fracture 2293.40 2294.20 0
2011-02-24 Perforation 2215.80 2216.60 6
2011-02-24 Multi-Stage Fracture 2215.80 2216.60 0
2011-02-24 Perforation 2139.10 2139.90 6
2011-02-24 Multi-Stage Fracture 2139.10 2139.90 0
2011-02-24 Perforation 2023.60 2024.40 6
2011-02-24 Multi-Stage Fracture 2023.60 2024.40 0
2011-02-24 Perforation 1896.10 1896.90 6
2011-02-24 Multi-Stage Fracture 1896.10 1896.90 0
2011-02-24 Perforation 1756.60 1757.40 6
2011-02-23 Perforation 3376.80 3377.60 6
2011-02-24 Multi-Stage Fracture 1756.60 1757.40 0
2011-02-24 Perforation 1665.70 1666.50 6
2011-02-24 Multi-Stage Fracture 1665.70 1666.50 0
2011-02-23 Perforation 3274.30 3275.10 6
2011-02-23 Perforation 3182.90 3183.70 6
2011-02-23 Multi-Stage Fracture 3182.90 3183.70 0
2011-02-23 Perforation 3080.80 3081.60 6
2011-02-23 Multi-Stage Fracture 3080.80 3081.60 0
2011-02-23 Perforation 2953.40 2954.20 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6208 0.0 0.0 0.0
2012 7981 0.0 0.0 0.0
2013 7637 0.0 0.0 0.0
2014 8420 0.0 0.0 0.0
2015 6530 0.0 0.0 0.0
2016 6324 0.0 0.0 0.0
2017 7951 0.0 0.0 0.0
2018 8039 0.0 0.0 0.0
2019 8455 0.0 0.0 0.0
2020 2141 0.0 0.0 0.0

For data sources see[6]

References