X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886091903000

Well Details

Well ID: 0886091903000
Loading map...
Location: 00/03-19-088-09W6/0
Location Alias: 00/03-19-88-09 W6M
Location Alias 2: 00/03-19-088-09 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 09
Section: 19
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 5-24HZ WORSLEY 3-19-88-9
Operator Name: Enercapita Energy Ltd.
License Number: 0433397
License Date: 2011-05-10
License Status: Issued
Spud Date: 2011-06-03
Final Drill Date: 2011-06-18
Well Total Depth: 3355.00 m
Surface Hole Latitude: 56.643752
Surface Hole Longitude: -119.459564

For data sources see[1][2]

Well History

Date Event
2011-05-10 Obtained License
2011-06-03 Surface Casing Operation Performed
2011-06-06 Direction Drilling Operation Performed - Horizontal
2011-06-09 Intermediate Casing Operation Performed
2011-06-09 Well Log Performed
2011-06-18 Finished Drilling
2011-06-18 Well Mode changed to Drilled and Cased
2011-06-20 Liner Casing Operation Performed
2011-06-21 Rig Released
2011-07-05 Well Log Performed
2011-08-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-04 Perforation Treatment Performed - Open-Hole Completion
2011-09-08 Well Began Production
2011-09-08 Well Fluid changed to Crude Oil
2011-09-08 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-06 1156.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-04 Open Hole/Barefoot Completion 3345.00 3355.00 0
2011-08-04 Multi-Stage Fracture 2518.50 2519.30 0
2011-08-04 Multi-Stage Fracture 2428.10 2428.90 0
2011-08-04 Multi-Stage Fracture 2276.20 2277.00 0
2011-08-04 Multi-Stage Fracture 2173.00 2173.80 0
2011-08-04 Multi-Stage Fracture 2045.80 2046.60 0
2011-08-04 Multi-Stage Fracture 1942.90 1943.70 0
2011-08-04 Multi-Stage Fracture 1815.90 1816.70 0
2011-08-04 Multi-Stage Fracture 1750.00 1750.80 0
2011-08-04 Multi-Stage Fracture 1576.10 1576.90 0
2011-08-04 Multi-Stage Fracture 3340.50 3341.30 0
2011-08-04 Multi-Stage Fracture 3237.70 3238.50 0
2011-08-04 Multi-Stage Fracture 3134.80 3135.60 0
2011-08-04 Multi-Stage Fracture 3056.50 3057.30 0
2011-08-04 Multi-Stage Fracture 2966.40 2967.20 0
2011-08-04 Multi-Stage Fracture 2888.50 2889.30 0
2011-08-04 Multi-Stage Fracture 2760.00 2760.80 0
2011-08-04 Multi-Stage Fracture 2670.00 2670.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1888 0.0 0.0 0.0
2012 7530 0.0 0.0 0.0
2013 6940 0.0 0.0 0.0
2014 8029 0.0 0.0 0.0
2015 7898 0.0 0.0 0.0
2016 5453 0.0 0.0 0.0
2018 6298 0.0 0.0 0.0
2019 7217 0.0 0.0 0.0
2020 2073 0.0 0.0 0.0

For data sources see[6]

References