If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886090612020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.608778,"lon":-119.441971,"icon":""}]} |
Location: 02/12-06-088-09W6/0 | |
Location Alias: 02/12-06-88-09 W6M | |
Location Alias 2: 02/12-06-088-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 09 | |
Section: 06 | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF 102 HZ WORSLEY 12-6-88-9 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0436623 | |
License Date: 2011-09-08 | |
License Status: Amended | |
Spud Date: 2011-09-30 | |
Final Drill Date: 2011-10-07 | |
Well Total Depth: 1878.00 m | |
Surface Hole Latitude: 56.608778 | |
Surface Hole Longitude: -119.441971 |
Date | Event |
---|---|
2011-09-08 | Obtained License |
2011-10-01 | Surface Casing Operation Performed |
2011-10-03 | Direction Drilling Operation Performed - Horizontal |
2011-10-05 | Intermediate Casing Operation Performed |
2011-10-05 | Well Log Performed |
2011-10-07 | Finished Drilling |
2011-10-07 | Well Mode changed to Drilled and Cased |
2011-10-08 | Liner Casing Operation Performed |
2011-10-09 | Rig Released |
2011-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-17 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-23 | Well Began Production |
2011-12-23 | Well Fluid changed to Crude Oil |
2011-12-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-03 | 1034.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-17 | Open Hole/Barefoot Completion | 1875.00 | 1878.00 | 0 |
2011-10-17 | Multi-Stage Fracture | 1870.00 | 1870.80 | 0 |
2011-10-17 | Multi-Stage Fracture | 1766.70 | 1767.50 | 0 |
2011-10-17 | Multi-Stage Fracture | 1676.10 | 1676.90 | 0 |
2011-10-17 | Multi-Stage Fracture | 1573.10 | 1573.90 | 0 |
2011-10-17 | Multi-Stage Fracture | 1470.20 | 1471.00 | 0 |
2011-10-17 | Multi-Stage Fracture | 1367.90 | 1368.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 216 | 0.0 | 0.0 | 0.0 |
2012 | 8291 | 0.0 | 0.0 | 0.0 |
2013 | 8284 | 0.0 | 0.0 | 0.0 |
2014 | 8554 | 0.0 | 0.0 | 0.0 |
2015 | 8361 | 0.0 | 0.0 | 0.0 |
2016 | 6609 | 0.0 | 0.0 | 0.0 |
2017 | 4748 | 0.0 | 0.0 | 0.0 |
2018 | 8667 | 0.0 | 0.0 | 0.0 |
2019 | 5940 | 0.0 | 0.0 | 0.0 |
2020 | 2153 | 0.0 | 0.0 | 0.0 |
For data sources see[6]