X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886072006002

Well Details

Well ID: 0886072006002
Loading map...
Location: 00/06-20-088-07W6/2
Location Alias: 00/06-20-88-07 W6M
Location Alias 2: 00/06-20-088-07 W6/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 07
Section: 20
County/Municipality: Clear Hills County
Well Name: OLY WORSLEY 6-20-88-7
Operator Name: Shoreline Energy Corp.
License Number: 0061363
License Date: 1976-11-29
License Status: Abandoned
Spud Date: 1976-12-03
Final Drill Date: 1976-12-28
Well Total Depth: 2786.80 m
Surface Hole Latitude: 56.644088
Surface Hole Longitude: -119.082792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-29 Obtained License
1976-12-28 Finished Drilling
1976-12-28 Well Mode changed to Drilled and Cased
1976-12-30 Drill Stem Test Performed
1976-12-31 Drill Stem Test Performed
1977-01-02 Production Casing Operation Performed
1977-01-30 Perforation Treatment Performed - Jet Perforation
1977-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-03 Perforation Treatment Performed - Jet Perforation
1990-08-06 Perforation Treatment Performed - Jet Perforation
1995-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-05 Plug Back Performed
1995-10-05 Well Log Performed
1995-10-06 Perforation Treatment Performed - Jet Perforation
1995-10-06 Well Log Performed
1995-10-07 Well Began Production
1995-10-07 Well Fluid changed to Gas
1995-10-07 Well Mode changed to Flowing
1996-03-21 Perforation Treatment Performed - Jet Perforation
1996-03-21 Well Fluid changed to Gas
1996-03-21 Well Mode changed to Flowing
1996-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-01 Well Fluid changed to Gas
2001-04-01 Well Mode changed to Suspended
2003-02-16 Perforation Treatment Performed - Jet Perforation
2003-02-18 Perforation Treatment Performed - Jet Perforation
2003-02-19 Well Log Performed
2003-02-20 Perforation Treatment Performed - Cement Squeeze
2003-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-21 Plug Back Performed
2003-02-21 Well Log Performed
2003-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-22 Plug Back Performed
2003-02-22 Well Fluid changed to Gas
2003-02-22 Well Mode changed to Abandoned Zone
2019-01-19 Perforation Treatment Performed - Jet Perforation
2019-01-19 Well Log Performed
2019-01-20 Perforation Treatment Performed - Cement Plug
2019-01-20 Perforation Treatment Performed - Cement Squeeze
2019-01-20 Plug Back Performed
2019-01-21 Perforation Treatment Performed - Jet Perforation
2019-01-21 Well Log Performed
2019-01-22 Perforation Treatment Performed - Cement Plug
2019-01-22 Perforation Treatment Performed - Cement Squeeze
2019-01-22 Plug Back Performed
2019-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-30 Perforation 1327.40 1330.50 13
1996-03-26 Acid Treatment 1226.50 1235.00 0
2003-02-16 Perforation 1306.40 1307.30 14
2003-02-18 Perforation 1327.40 1330.50 13
2003-02-20 Cement Squeeze 1327.40 1330.50 0
2003-02-21 Packing Device Capped w/Cement 1312.00 1320.00 0
2003-02-22 Packing Device Capped w/Cement 1287.00 1295.00 0
2003-02-22 Packing Device Capped w/Cement 1207.00 1215.00 0
2019-01-19 Perforation 935.00 936.00 17
2019-01-19 Perforation 889.00 890.00 17
2019-01-20 Cement Squeeze 935.00 936.00 0
1977-02-01 Acid Treatment 1327.40 1330.50 0
2019-01-20 Cement Squeeze 889.00 890.00 0
2019-01-20 Cement Plug 871.50 952.00 0
2019-01-21 Perforation 588.00 589.00 17
2019-01-21 Perforation 372.00 373.00 17
2019-01-21 Perforation 335.00 336.00 17
2019-01-21 Perforation 321.00 322.00 17
2019-01-22 Cement Squeeze 588.00 589.00 0
2019-01-22 Cement Squeeze 372.00 373.00 0
2019-01-22 Cement Squeeze 335.00 336.00 0
2019-01-22 Cement Squeeze 321.00 322.00 0
1990-08-03 Perforation 1343.20 1346.00 13
2019-01-22 Cement Plug 172.50 607.00 0
1990-08-06 Perforation 1334.70 1338.90 13
1995-10-05 Packing Device Capped w/Cement 1310.00 1320.00 0
1995-10-06 Perforation 1306.40 1307.30 14
1996-03-21 Perforation 1226.50 1227.70 14
1996-03-21 Perforation 1233.80 1235.00 14
1996-03-21 Perforation 1301.50 1302.40 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1437 0.0 0.0 0.0
1996 3497 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References