X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886063013002

Well Details

Well ID: 0886063013002
Loading map...
Location: 00/13-30-088-06W6/2
Location Alias: 00/13-30-88-06 W6M
Location Alias 2: 00/13-30-088-06 W6/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 06
Section: 30
County/Municipality: Clear Hills County
Well Name: SYDCO CHARLIE 13-30-88-6
Operator Name: Sydco Energy Inc.
License Number: 0221316
License Date: 1999-02-08
License Status: Abandoned
Spud Date: 1999-02-22
Final Drill Date: 1999-02-27
Well Total Depth: 1305.00 m
Surface Hole Latitude: 56.667970
Surface Hole Longitude: -118.958081

For data sources see[1][2]

Well History

Date Event
1999-02-08 Obtained License
1999-02-22 Surface Casing Operation Performed
1999-02-27 Finished Drilling
1999-02-27 Well Mode changed to Drilled and Cased
1999-02-28 Well Log Performed
1999-03-01 Drill Stem Test Performed
1999-03-01 Production Casing Operation Performed
1999-03-02 Rig Released
1999-03-09 Perforation Treatment Performed - Jet Perforation
1999-03-09 Well Log Performed
1999-03-09 Well Mode changed to Drilled and Cased
1999-08-23 Well Began Production
1999-08-23 Well Fluid changed to Gas
1999-08-23 Well Mode changed to Flowing
2001-12-14 Well Log Performed
2001-12-16 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-12-16 Well Fluid changed to Gas
2001-12-16 Well Mode changed to Flowing
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Suspended
2019-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-22 Plug Back Performed
2019-01-22 Well Fluid changed to Gas
2019-01-22 Well Mode changed to Abandoned Zone
2019-01-30 Well Abandoned
2019-01-30 Well Fluid changed to Gas
2019-01-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-09 Perforation 1173.50 1175.00 20
2019-01-22 Packing Device Capped w/Cement 1222.00 1230.00 0
2019-01-22 Packing Device Capped w/Cement 1160.00 1168.00 0
1999-03-09 Perforation 1178.50 1182.00 20
1999-03-09 Perforation 1185.00 1188.00 20
1999-03-09 Perforation 1190.00 1192.00 20
1999-03-09 Perforation 1197.00 1199.90 20
1999-03-09 Perforation 1236.70 1238.00 20
1999-03-09 Perforation 1238.70 1240.00 20
1999-03-09 Perforation 1241.00 1242.20 20
2001-12-16 Bridge Plug, No Cement 1238.20 1238.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2542 0.0 0.0 0.0
2000 8030 0.0 0.0 0.0
2001 8223 0.0 0.0 0.0
2002 6940 0.0 0.0 0.0
2003 7008 0.0 0.0 0.0
2004 5878 0.0 0.0 0.0
2005 5164 0.0 0.0 0.0
2006 3297 0.0 0.0 0.0
2007 3219 0.0 0.0 0.0
2008 2313 0.0 0.0 0.0
2009 5436 0.0 0.0 0.0
2010 2670 0.0 0.0 0.0
2011 3881 0.0 0.0 0.0
2012 1688 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References