X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886022816000

Well Details

Well ID: 0886022816000
Loading map...
Location: 00/16-28-088-02W6/0
Location Alias: 00/16-28-88-02 W6M
Location Alias 2: 00/16-28-088-02 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 02
Section: 28
County/Municipality: Clear Hills County
Well Name: DEVON BEATON 16-28-88-2
Operator Name: Devon Canada Corporation
License Number: 0174090
License Date: 1994-12-14
License Status: RecCertified
Spud Date: 1994-12-14
Final Drill Date: 1994-12-18
Well Total Depth: 988.00 m
Surface Hole Latitude: 56.665320
Surface Hole Longitude: -118.244999

For data sources see[1][2]

Well History

Date Event
1994-12-14 Obtained License
1994-12-15 Surface Casing Operation Performed
1994-12-18 Finished Drilling
1994-12-18 Well Log Performed
1994-12-18 Well Mode changed to Drilled and Cased
1994-12-19 Well Log Performed
1994-12-20 Production Casing Operation Performed
1994-12-20 Rig Released
1995-09-15 Well Log Performed
1995-09-16 Well Log Performed
1995-09-17 Perforation Treatment Performed - Jet Perforation
1995-09-18 Perforation Treatment Performed - Cement Squeeze
1995-09-21 Well Log Performed
1995-09-23 Perforation Treatment Performed - Jet Perforation
1997-05-23 Well Began Production
1997-05-23 Well Fluid changed to Gas
1997-05-23 Well Mode changed to Flowing
2000-01-25 Well Log Performed
2000-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-26 Plug Back Performed
2000-01-26 Well Log Performed
2000-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-27 Perforation Treatment Performed - Jet Perforation
2000-01-27 Plug Back Performed
2000-01-29 Well Abandoned
2000-01-29 Well Fluid changed to Gas
2000-01-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-17 Perforation 547.00 548.00 18
1995-09-17 Perforation 554.00 555.00 18
1995-09-18 Cement Squeeze 547.00 555.00 0
1995-09-23 Perforation 547.00 548.00 14
2000-01-26 Packing Device Capped w/Cement 538.00 546.00 0
2000-01-27 Perforation 512.00 514.00 14
2000-01-27 Packing Device Capped w/Cement 498.00 506.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4625 0.0 0.0 0.0
1998 1473 0.0 0.0 0.0
1999 959 0.0 0.0 0.0

For data sources see[5]

References