If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885122413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.646912,"lon":-115.75307,"icon":""}]} |
Location: 02/13-24-088-12W5/0 | |
Location Alias: 02/13-24-88-12 W5M | |
Location Alias 2: 02/13-24-088-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 24 | |
County/Municipality: Northern Sunrise County | |
Well Name: MBOG EVI 13-24-88-12 | |
Operator Name: Surge Energy Inc. | |
License Number: 0446117 | |
License Date: 2012-05-28 | |
License Status: Amended | |
Spud Date: 2012-08-15 | |
Final Drill Date: 2012-08-29 | |
Well Total Depth: 3306.00 m | |
Surface Hole Latitude: 56.646912 | |
Surface Hole Longitude: -115.753070 |
Date | Event |
---|---|
2012-05-28 | Obtained License |
2012-08-19 | Surface Casing Operation Performed |
2012-08-21 | Lost Circulation Occurred |
2012-08-22 | Direction Drilling Operation Performed - Deviate |
2012-08-22 | Well Log Performed |
2012-08-23 | Direction Drilling Operation Performed - Horizontal |
2012-08-23 | Well Log Performed |
2012-08-25 | Intermediate Casing Operation Performed |
2012-08-29 | Finished Drilling |
2012-08-29 | Well Log Performed |
2012-08-29 | Well Structure changed to Drain |
2012-09-01 | Liner Casing Operation Performed |
2012-09-15 | Rig Released |
2012-09-15 | Well Log Performed |
2012-09-24 | Well Log Performed |
2012-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-19 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-23 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-15 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-22 | 1257.00 | Deviate (5 - 79 degrees) |
2012-08-23 | 1632.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-19 | Open Hole/Barefoot Completion | 3296.00 | 3306.00 | 0 |
2012-10-22 | Multi-Stage Fracture | 2741.70 | 2741.80 | 0 |
2012-10-22 | Multi-Stage Fracture | 2682.50 | 2682.60 | 0 |
2012-10-22 | Multi-Stage Fracture | 2609.60 | 2609.70 | 0 |
2012-10-22 | Multi-Stage Fracture | 2550.30 | 2550.40 | 0 |
2012-10-22 | Multi-Stage Fracture | 2477.40 | 2477.50 | 0 |
2012-10-22 | Multi-Stage Fracture | 2418.10 | 2418.20 | 0 |
2012-10-22 | Multi-Stage Fracture | 2345.30 | 2345.40 | 0 |
2012-10-22 | Multi-Stage Fracture | 2285.90 | 2286.00 | 0 |
2012-10-22 | Multi-Stage Fracture | 2213.10 | 2213.20 | 0 |
2012-10-22 | Multi-Stage Fracture | 2153.70 | 2153.80 | 0 |
2012-10-19 | Multi-Stage Fracture | 3273.50 | 3273.60 | 0 |
2012-10-22 | Multi-Stage Fracture | 2081.90 | 2082.00 | 0 |
2012-10-23 | Multi-Stage Fracture | 2009.00 | 2009.10 | 0 |
2012-10-23 | Open Hole/Barefoot Completion | 1659.30 | 1779.50 | 0 |
2012-10-19 | Multi-Stage Fracture | 3208.10 | 3208.20 | 0 |
2012-10-19 | Multi-Stage Fracture | 3136.10 | 3136.20 | 0 |
2012-10-19 | Multi-Stage Fracture | 3077.40 | 3077.50 | 0 |
2012-10-21 | Multi-Stage Fracture | 3004.60 | 3004.70 | 0 |
2012-10-21 | Multi-Stage Fracture | 2946.30 | 2946.40 | 0 |
2012-10-21 | Multi-Stage Fracture | 2873.50 | 2873.60 | 0 |
2012-10-21 | Multi-Stage Fracture | 2814.60 | 2814.70 | 0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-21 | Lost Circulation | 933.00 | 982.00 |
2012-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]