If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885122404002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.646364,"lon":-115.753097,"icon":""}]} |
Location: 00/04-24-088-12W5/2 | |
Location Alias: 00/04-24-88-12 W5M | |
Location Alias 2: 00/04-24-088-12 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 24 | |
County/Municipality: Northern Sunrise County | |
Well Name: MBOG EVI 4-24-88-12 | |
Operator Name: Surge Energy Inc. | |
License Number: 0432260 | |
License Date: 2011-03-11 | |
License Status: Amended | |
Spud Date: 2011-12-13 | |
Final Drill Date: 2012-01-16 | |
Well Total Depth: 3225.00 m | |
Surface Hole Latitude: 56.646364 | |
Surface Hole Longitude: -115.753097 |
Date | Event |
---|---|
2011-03-11 | Obtained License |
2011-12-15 | Surface Casing Operation Performed |
2011-12-30 | Direction Drilling Operation Performed - Horizontal |
2012-01-03 | Intermediate Casing Operation Performed |
2012-01-11 | Direction Drilling Operation Performed - Horizontal |
2012-01-16 | Finished Drilling |
2012-01-16 | Well Log Performed |
2012-01-16 | Well Mode changed to Drilled and Cased |
2012-01-17 | Well Log Performed |
2012-01-19 | Liner Casing Operation Performed |
2012-01-21 | Rig Released |
2012-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-08 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-17 | Well Began Production |
2012-02-17 | Well Fluid changed to Crude Oil |
2012-02-17 | Well Mode changed to Flowing |
2012-03-29 | Well Fluid changed to Crude Oil |
2012-03-29 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-30 | 1100.00 | Horizontal |
2012-01-11 | 1790.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-08 | Open Hole/Barefoot Completion | 3212.40 | 3225.00 | 0 |
2012-02-12 | Multi-Stage Fracture | 2713.80 | 2713.90 | 0 |
2012-02-12 | Multi-Stage Fracture | 2654.80 | 2654.90 | 0 |
2012-02-12 | Multi-Stage Fracture | 2595.70 | 2595.80 | 0 |
2012-02-12 | Multi-Stage Fracture | 2537.40 | 2537.50 | 0 |
2012-02-12 | Multi-Stage Fracture | 2478.40 | 2478.50 | 0 |
2012-02-12 | Multi-Stage Fracture | 2422.30 | 2422.40 | 0 |
2012-02-12 | Multi-Stage Fracture | 2363.30 | 2363.40 | 0 |
2012-02-12 | Multi-Stage Fracture | 2304.50 | 2304.60 | 0 |
2012-02-12 | Multi-Stage Fracture | 2245.50 | 2245.60 | 0 |
2012-02-12 | Multi-Stage Fracture | 2186.40 | 2186.50 | 0 |
2012-02-08 | Multi-Stage Fracture | 3182.30 | 3182.40 | 0 |
2012-02-12 | Multi-Stage Fracture | 2114.50 | 2114.60 | 0 |
2012-02-10 | Multi-Stage Fracture | 3123.30 | 3123.40 | 0 |
2012-02-10 | Multi-Stage Fracture | 3064.20 | 3064.30 | 0 |
2012-02-11 | Multi-Stage Fracture | 3005.30 | 3005.40 | 0 |
2012-02-11 | Multi-Stage Fracture | 2948.40 | 2948.50 | 0 |
2012-02-11 | Multi-Stage Fracture | 2889.70 | 2889.80 | 0 |
2012-02-11 | Multi-Stage Fracture | 2831.80 | 2831.90 | 0 |
2012-02-11 | Multi-Stage Fracture | 2772.70 | 2772.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5671 | 0.0 | 0.0 | 0.0 |
2013 | 8558 | 0.0 | 0.0 | 0.0 |
2014 | 8117 | 0.0 | 0.0 | 0.0 |
2015 | 7612 | 0.0 | 0.0 | 0.0 |
2016 | 8658 | 0.0 | 0.0 | 0.0 |
2017 | 7706 | 0.0 | 0.0 | 0.0 |
2018 | 8455 | 0.0 | 0.0 | 0.0 |
2019 | 8583 | 0.0 | 0.0 | 0.0 |
2020 | 1260 | 0.0 | 0.0 | 0.0 |
For data sources see[6]