X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122204002

Well Details

Well ID: 0885122204002
Loading map...
Location: 00/04-22-088-12W5/2
Location Alias: 00/04-22-88-12 W5M
Location Alias 2: 00/04-22-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 22
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 4-22-88-12
Operator Name: Surge Energy Inc.
License Number: 0431185
License Date: 2011-02-04
License Status: Amended
Spud Date: 2011-10-08
Final Drill Date: 2011-11-07
Well Total Depth: 3330.00 m
Surface Hole Latitude: 56.646283
Surface Hole Longitude: -115.806543

For data sources see[1][2]

Well History

Date Event
2011-02-04 Obtained License
2011-10-12 Surface Casing Operation Performed
2011-10-16 Direction Drilling Operation Performed - Horizontal
2011-10-19 Intermediate Casing Operation Performed
2011-11-02 Direction Drilling Operation Performed - Horizontal
2011-11-02 Well Log Performed
2011-11-07 Finished Drilling
2011-11-07 Well Log Performed
2011-11-07 Well Mode changed to Drilled and Cased
2011-11-09 Liner Casing Operation Performed
2011-11-10 Rig Released
2012-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-20 Perforation Treatment Performed - Open-Hole Completion
2012-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-03 Well Began Production
2012-03-03 Well Fluid changed to Crude Oil
2012-03-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-16 1229.00 Horizontal
2011-11-02 1796.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-20 Open Hole/Barefoot Completion 3318.00 3330.00 0
2012-01-21 Multi-Stage Fracture 2780.20 2780.30 0
2012-01-21 Multi-Stage Fracture 2708.60 2708.70 0
2012-01-21 Multi-Stage Fracture 2649.80 2649.90 0
2012-01-21 Multi-Stage Fracture 2578.10 2578.20 0
2012-01-21 Multi-Stage Fracture 2519.30 2519.40 0
2012-01-21 Multi-Stage Fracture 2447.70 2447.80 0
2012-01-21 Multi-Stage Fracture 2388.90 2389.00 0
2012-01-21 Multi-Stage Fracture 2330.10 2330.20 0
2012-01-21 Multi-Stage Fracture 2258.40 2258.50 0
2012-01-21 Multi-Stage Fracture 2199.60 2199.70 0
2012-01-20 Multi-Stage Fracture 3301.90 3302.00 0
2012-01-21 Multi-Stage Fracture 2127.90 2128.00 0
2012-01-20 Multi-Stage Fracture 3230.30 3230.40 0
2012-01-20 Multi-Stage Fracture 3171.50 3171.60 0
2012-01-20 Multi-Stage Fracture 3099.90 3100.00 0
2012-01-20 Multi-Stage Fracture 3041.10 3041.20 0
2012-01-20 Multi-Stage Fracture 2969.40 2969.50 0
2012-01-20 Multi-Stage Fracture 2910.60 2910.70 0
2012-01-21 Multi-Stage Fracture 2838.90 2839.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6212 0.0 0.0 0.0
2013 8518 0.0 0.0 0.0
2014 7321 0.0 0.0 0.0
2015 7563 0.0 0.0 0.0
2016 7544 0.0 0.0 0.0
2017 7977 0.0 0.0 0.0
2018 8627 0.0 0.0 0.0
2019 7662 0.0 0.0 0.0
2020 2076 0.0 0.0 0.0

For data sources see[6]

References