X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885111916002

Well Details

Well ID: 0885111916002
Loading map...
Location: 00/16-19-088-11W5/2
Location Alias: 00/16-19-88-11 W5M
Location Alias 2: 00/16-19-088-11 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 11
Section: 19
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 13-19-88-11
Operator Name: Surge Energy Inc.
License Number: 0412019
License Date: 2009-08-28
License Status: Amended
Spud Date: 2009-12-03
Final Drill Date: 2010-01-01
Well Total Depth: 2779.00 m
Surface Hole Latitude: 56.651714
Surface Hole Longitude: -115.755844

For data sources see[1][2]

Well History

Date Event
2009-08-28 Obtained License
2009-12-04 Surface Casing Operation Performed
2009-12-16 Direction Drilling Operation Performed - Horizontal
2009-12-18 Well Log Performed
2009-12-19 Intermediate Casing Operation Performed
2010-01-01 Finished Drilling
2010-01-01 Well Log Performed
2010-01-01 Well Mode changed to Drilled and Cased
2010-01-03 Liner Casing Operation Performed
2010-01-03 Well Log Performed
2010-01-04 Rig Released
2010-01-13 Well Log Performed
2010-02-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-27 Perforation Treatment Performed - Fractured
2010-02-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-28 Perforation Treatment Performed - Fractured
2010-03-24 Well Began Production
2010-03-24 Well Fluid changed to Crude Oil
2010-03-24 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-16 1265.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-27 Hydra Jet Perforation 2741.50 2741.60 4
2010-02-27 Fracture 2422.00 2422.10 0
2010-02-27 Hydra Jet Perforation 2328.00 2328.10 4
2010-02-27 Fracture 2328.00 2328.10 0
2010-02-27 Hydra Jet Perforation 2247.50 2247.60 4
2010-02-27 Fracture 2247.50 2247.60 0
2010-02-27 Hydra Jet Perforation 2166.00 2166.10 4
2010-02-27 Fracture 2166.00 2166.10 0
2010-02-28 Hydra Jet Perforation 2068.00 2068.10 4
2010-02-28 Hydra Jet Perforation 2055.00 2055.10 4
2010-02-28 Fracture 2055.00 2055.10 0
2010-02-27 Fracture 2741.50 2741.60 0
2010-02-28 Hydra Jet Perforation 2050.00 2050.10 4
2010-02-28 Fracture 2050.00 2050.10 0
2010-02-28 Hydra Jet Perforation 1998.50 1998.60 4
2010-02-28 Fracture 1998.50 1998.60 0
2010-02-28 Hydra Jet Perforation 1934.00 1934.10 4
2010-02-28 Fracture 1934.00 1934.10 0
2010-02-28 Hydra Jet Perforation 1858.50 1858.60 4
2010-02-28 Fracture 1858.50 1858.60 0
2010-02-28 Hydra Jet Perforation 1785.00 1785.10 4
2010-02-28 Fracture 1785.00 1785.10 0
2010-02-27 Hydra Jet Perforation 2662.50 2662.60 4
2010-02-28 Hydra Jet Perforation 1687.00 1687.10 4
2010-02-28 Fracture 1687.00 1687.10 0
2010-02-27 Fracture 2662.50 2662.60 0
2010-02-27 Hydra Jet Perforation 2585.50 2585.60 4
2010-02-27 Fracture 2585.50 2585.60 0
2010-02-27 Hydra Jet Perforation 2508.00 2508.10 4
2010-02-27 Fracture 2508.00 2508.10 0
2010-02-27 Hydra Jet Perforation 2422.00 2422.10 4

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5969 0.0 0.0 0.0
2011 7973 0.0 0.0 0.0
2012 6678 0.0 0.0 0.0
2013 8611 0.0 0.0 0.0
2014 6531 0.0 0.0 0.0
2015 8163 0.0 0.0 0.0
2016 8378 0.0 0.0 0.0
2017 8595 0.0 0.0 0.0
2018 7433 0.0 0.0 0.0
2019 7121 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References