If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0885102809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.662923,"lon":-115.522606,"icon":""}]} |
| Location: 00/09-28-088-10W5/0 | |
| Location Alias: 00/09-28-88-10 W5M | |
| Location Alias 2: 00/09-28-088-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 088 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 28 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: BP ET AL RED EARTH 9-28-88-10 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0132117 | |
| License Date: 1988-02-10 | |
| License Status: RecCertified | |
| Spud Date: 1988-02-13 | |
| Final Drill Date: 1988-02-23 | |
| Well Total Depth: 1530.00 m | |
| Surface Hole Latitude: 56.662923 | |
| Surface Hole Longitude: -115.522606 |
| Date | Event |
|---|---|
| 1988-02-10 | Obtained License |
| 1988-02-14 | Surface Casing Operation Performed |
| 1988-02-17 | Lost Circulation Occurred |
| 1988-02-23 | Finished Drilling |
| 1988-02-23 | Well Log Performed |
| 1988-02-24 | Well Log Performed |
| 1988-02-25 | Drill Stem Test Performed |
| 1988-02-26 | Drill Stem Test Performed |
| 1988-02-29 | Well Log Performed |
| 1988-03-02 | Production Casing Operation Performed |
| 1988-03-02 | Rig Released |
| 1988-03-03 | Well Log Performed |
| 1988-03-11 | Well Log Performed |
| 1988-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1988-03-13 | Well Log Performed |
| 1988-03-15 | Perforation Treatment Performed - Remedial Casing |
| 1988-03-16 | Well Log Performed |
| 1988-03-17 | Well Log Performed |
| 1988-03-18 | Perforation Treatment Performed - Jet Perforation |
| 1988-03-23 | Well Mode changed to Drilled and Cased |
| 1990-02-28 | Well Log Performed |
| 1991-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-02-27 | Plug Back Performed |
| 1991-02-27 | Well Mode changed to Abandoned |
| 1991-02-28 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-03-13 | Perforation | 1487.50 | 1488.00 | 13 |
| 1988-03-13 | Perforation | 1496.00 | 1496.50 | 13 |
| 1988-03-13 | Acid Treatment | 1487.50 | 1496.50 | 0 |
| 1988-03-15 | Remedial Casing Cementing | 1487.50 | 1496.50 | 0 |
| 1988-03-18 | Perforation | 1489.50 | 1490.50 | 13 |
| 1988-03-18 | Perforation | 1491.00 | 1493.00 | 13 |
| 1991-02-27 | Packing Device Capped w/Cement | 1471.00 | 1479.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1988-02-17 | Lost Circulation | 800.00 | 850.00 |
For data sources see[5]