X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885091410000

Well Details

Well ID: 0885091410000
Loading map...
Location: 00/10-14-088-09W5/0
Location Alias: 00/10-14-88-09 W5M
Location Alias 2: 00/10-14-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 14
County/Municipality: Municipal District of Opportunity No. 17
Well Name: TARRAGON RED EARTH 10-14-88-9
Operator Name: Marathon Canada Limited
License Number: 0030999
License Date: 1966-09-16
License Status: RecCertified
Spud Date: 1966-09-21
Final Drill Date: 1966-10-10
Well Total Depth: 1449.00 m
Surface Hole Latitude: 56.633761
Surface Hole Longitude: -115.314512

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-16 Obtained License
1966-09-26 Drill Stem Test Performed
1966-10-10 Finished Drilling
1966-10-10 Well Mode changed to Drilled and Cased
1966-10-11 Drill Stem Test Performed
1966-10-12 Drill Stem Test Performed
1966-10-14 Production Casing Operation Performed
1966-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-03 Perforation Treatment Performed - Jet Perforation
1966-11-05 Well Began Production
1966-11-05 Well Fluid changed to Crude Oil
1966-11-05 Well Mode changed to Pumping
1968-02-06 Well Fluid changed to Crude Oil
1968-02-06 Well Mode changed to Suspended
1978-06-04 Well Fluid changed to Crude Oil
1978-06-04 Well Mode changed to Pumping
1989-12-31 Well Fluid changed to Crude Oil
1989-12-31 Well Mode changed to Suspended
1990-08-18 Plug Back Performed
1990-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-18 Well Fluid changed to Crude Oil
1990-09-18 Well Log Performed
1990-09-18 Well Mode changed to Abandoned
1990-09-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-11-03 Perforation 1290.50 1296.00 7
1966-11-03 Acid Treatment 1290.50 1296.00 0
1990-09-18 Packing Device Capped w/Cement 1262.00 1270.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 4929 0.0 0.0 0.0
1968 2618 0.0 0.0 0.0
1969 1360 0.0 0.0 0.0
1970 1732 0.0 0.0 0.0
1971 1118 0.0 0.0 0.0
1972 1218 0.0 0.0 0.0
1973 3484 0.0 0.0 0.0
1974 5309 0.0 0.0 0.0
1975 5323 0.0 0.0 0.0
1976 5221 0.0 0.0 0.0
1977 5478 0.0 0.0 0.0
1978 6272 0.0 0.0 0.0
1979 6556 0.0 0.0 0.0
1980 6751 0.0 0.0 0.0
1981 6524 0.0 0.0 0.0
1982 7966 0.0 0.0 0.0
1983 8092 0.0 0.0 0.0
1984 8445 0.0 0.0 0.0
1985 8517 0.0 0.0 0.0
1986 3191 0.0 0.0 0.0
1988 6654 0.0 0.0 0.0

For data sources see[5]

References