X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885082006000

Well Details

Well ID: 0885082006000
Loading map...
Location: 00/06-20-088-08W5/0
Location Alias: 00/06-20-88-08 W5M
Location Alias 2: 00/06-20-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 20
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 6-20-88-8
Operator Name: Surge Energy Inc.
License Number: 0052218
License Date: 1974-12-16
License Status: Suspension
Spud Date: 1975-01-07
Final Drill Date: 1975-01-19
Well Total Depth: 1318.90 m
Surface Hole Latitude: 56.646004
Surface Hole Longitude: -115.239247

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-16 Obtained License
1975-01-19 Finished Drilling
1975-01-19 Well Mode changed to Drilled and Cased
1975-01-20 Drill Stem Test Performed
1975-01-22 Production Casing Operation Performed
1975-03-04 Perforation Treatment Performed - Jet Perforation
1975-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-05 Perforation Treatment Performed - Acid Wash - No Pressure
1975-03-05 Well Began Injection
1975-03-05 Well Fluid changed to Water
1975-03-05 Well Type changed to Injection
1986-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-01 Well Fluid changed to Water
2000-10-01 Well Mode changed to Suspended
2000-10-01 Well Type changed to Injection
2009-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-04 Perforation 1264.30 1269.80 13
1975-03-04 Perforation 1281.10 1284.70 13
1975-03-05 Acid Wash 1264.30 1284.70 0
1975-03-05 Acid Treatment 1264.30 1284.70 0
1986-01-22 Acid Treatment 1264.30 1284.70 0
2009-03-17 Packing Device Capped w/Cement 1234.50 1249.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

References