X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885081710000

Well Details

Well ID: 0885081710000
Loading map...
Location: 00/10-17-088-08W5/0
Location Alias: 00/10-17-88-08 W5M
Location Alias 2: 00/10-17-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 17
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-17-88-8
Operator Name: Surge Energy Inc.
License Number: 0027841
License Date: 1965-02-25
License Status: Suspension
Spud Date: 1965-02-28
Final Drill Date: 1965-03-19
Well Total Depth: 1344.20 m
Surface Hole Latitude: 56.633760
Surface Hole Longitude: -115.234765

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-25 Obtained License
1965-03-04 Lost Circulation Occurred
1965-03-17 Drill Stem Test Performed
1965-03-19 Finished Drilling
1965-03-19 Well Mode changed to Drilled and Cased
1965-03-21 Production Casing Operation Performed
1965-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-23 Perforation Treatment Performed - Jet Perforation
1965-08-09 Well Began Production
1965-08-09 Well Fluid changed to Crude Oil
1965-08-09 Well Mode changed to Pumping
1973-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-16 Perforation Treatment Performed - Jet Perforation
1985-07-01 Well Fluid changed to Crude Oil
1985-07-01 Well Mode changed to Suspended
1997-10-07 Well Log Performed
1997-10-10 Well Log Performed
1997-12-03 Well Began Injection
1997-12-03 Well Fluid changed to Water
1997-12-03 Well Type changed to Injection
2005-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-29 Well Log Performed
2005-03-30 Well Fluid changed to Water
2005-03-30 Well Mode changed to Suspended
2005-03-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-23 Perforation 1275.90 1278.90 13
1965-03-23 Acid Treatment 1275.90 1278.90 0
1973-01-16 Perforation 1293.30 1296.30 7
1973-01-16 Acid Treatment 1293.30 1296.30 0
2005-03-29 Packing Device Capped w/Cement 1257.00 1265.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 7620 0.0 0.0 0.0
1969 7092 0.0 0.0 0.0
1970 6216 0.0 0.0 0.0
1971 6966 0.0 0.0 0.0
1972 7371 0.0 0.0 0.0
1973 7204 0.0 0.0 0.0
1974 7501 0.0 0.0 0.0
1975 8004 0.0 0.0 0.0
1976 8492 0.0 0.0 0.0
1977 7747 0.0 0.0 0.0
1978 5982 0.0 0.0 0.0
1985 1463 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-03-04 Lost Circulation 439.50 650.10

For data sources see[6]

References