X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080810000

Well Details

Well ID: 0885080810000
Loading map...
Location: 00/10-08-088-08W5/0
Location Alias: 00/10-08-88-08 W5M
Location Alias 2: 00/10-08-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 08
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-8-88-8
Operator Name: Surge Energy Inc.
License Number: 0044519
License Date: 1972-12-14
License Status: Abandoned
Spud Date: 1973-08-30
Final Drill Date: 1973-09-12
Well Total Depth: 1356.40 m
Surface Hole Latitude: 56.619698
Surface Hole Longitude: -115.234270

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-14 Obtained License
1973-09-12 Finished Drilling
1973-09-12 Well Mode changed to Drilled and Cased
1973-09-14 Drill Stem Test Performed
1973-09-15 Drill Stem Test Performed
1973-09-15 Production Casing Operation Performed
1973-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-07 Perforation Treatment Performed - Jet Perforation
1973-12-12 Well Began Production
1973-12-12 Well Fluid changed to Crude Oil
1973-12-12 Well Mode changed to Pumping
1989-12-31 Well Fluid changed to Crude Oil
1989-12-31 Well Mode changed to Suspended
2009-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-09 Plug Back Performed
2009-01-09 Well Fluid changed to Crude Oil
2009-01-09 Well Log Performed
2009-01-09 Well Mode changed to Abandoned Zone
2009-01-10 Perforation Treatment Performed - Cement Plug
2009-01-13 Well Abandoned
2009-01-13 Well Fluid changed to Crude Oil
2009-01-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-07 Perforation 1273.50 1276.50 13
1973-10-07 Perforation 1289.30 1291.10 0
1973-10-07 Acid Treatment 1273.50 1291.10 0
2009-01-09 Packing Device Capped w/Cement 1260.00 1268.00 0
2009-01-10 Cement Plug 328.90 472.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 480 0.0 0.0 0.0
1974 7796 0.0 0.0 0.0
1975 6701 0.0 0.0 0.0
1976 8024 0.0 0.0 0.0
1977 7629 0.0 0.0 0.0
1978 8592 0.0 0.0 0.0
1979 8592 0.0 0.0 0.0
1980 8579 0.0 0.0 0.0
1981 7296 0.0 0.0 0.0
1982 8350 0.0 0.0 0.0
1983 8566 0.0 0.0 0.0
1984 8582 0.0 0.0 0.0
1985 8513 0.0 0.0 0.0
1986 3452 0.0 0.0 0.0
1987 25 0.0 0.0 0.0
1988 4212 0.0 0.0 0.0

For data sources see[5]

References