X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080804000

Well Details

Well ID: 0885080804000
Loading map...
Location: 00/04-08-088-08W5/0
Location Alias: 00/04-08-88-08 W5M
Location Alias 2: 00/04-08-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 08
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-8-88-8
Operator Name: Surge Energy Inc.
License Number: 0027640
License Date: 1965-01-28
License Status: Suspension
Spud Date: 1965-01-29
Final Drill Date: 1965-02-13
Well Total Depth: 1432.60 m
Surface Hole Latitude: 56.612292
Surface Hole Longitude: -115.248758

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-01-28 Obtained License
1965-02-13 Finished Drilling
1965-02-13 Well Mode changed to Drilled and Cased
1965-02-15 Drill Stem Test Performed
1965-02-17 Production Casing Operation Performed
1965-02-18 Perforation Treatment Performed - Jet Perforation
1965-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-02-21 Perforation Treatment Performed - Fractured
1965-03-02 Well Began Production
1965-03-02 Well Fluid changed to Crude Oil
1965-03-02 Well Mode changed to Flowing
1966-05-16 Well Fluid changed to Crude Oil
1966-05-16 Well Mode changed to Abandoned Zone
1966-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-10 Perforation Treatment Performed - Bullet Perforation
1966-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-07-07 Perforation Treatment Performed - Fractured
1973-03-19 Perforation Treatment Performed - Jet Perforation
1973-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-29 Perforation Treatment Performed - Jet Perforation
1998-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-02-18 Perforation 1424.90 1426.20 13
1973-03-19 Perforation 1289.90 1294.80 13
1973-03-19 Perforation 1295.70 1296.90 13
1973-03-20 Acid Treatment 1276.80 1296.90 0
1998-01-29 Perforation 1272.00 1277.00 14
1998-01-30 Acid Treatment 1272.00 1277.00 0
1965-02-18 Perforation 1427.10 1429.50 13
1965-02-19 Acid Treatment 1424.90 1429.50 0
1965-02-21 Fracture 1424.90 1429.50 0
1966-06-10 Packing Device Capped w/Cement 1400.60 1409.70 0
1966-06-10 Bullet Perforation 1289.30 1293.00 7
1966-06-11 Acid Treatment 1289.30 1293.00 0
1966-07-07 Fracture 1289.30 1293.00 0
1973-03-19 Perforation 1276.80 1280.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0

For data sources see[5]

References