X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080610000

Well Details

Well ID: 0885080610000
Loading map...
Location: 00/10-06-088-08W5/0
Location Alias: 00/10-06-88-08 W5M
Location Alias 2: 00/10-06-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 06
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-6-88-8
Operator Name: Surge Energy Inc.
License Number: 0029181
License Date: 1965-10-20
License Status: Suspension
Spud Date: 1965-10-20
Final Drill Date: 1965-11-03
Well Total Depth: 1429.80 m
Surface Hole Latitude: 56.604666
Surface Hole Longitude: -115.261354

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-20 Obtained License
1965-10-29 Drill Stem Test Performed
1965-11-03 Finished Drilling
1965-11-03 Well Mode changed to Drilled and Cased
1965-11-05 Drill Stem Test Performed
1965-11-06 Drill Stem Test Performed
1965-11-07 Production Casing Operation Performed
1965-11-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-12 Perforation Treatment Performed - Fractured
1965-11-15 Well Began Production
1965-11-15 Well Fluid changed to Crude Oil
1965-11-15 Well Mode changed to Flowing
1965-11-18 Well Fluid changed to Crude Oil
1965-11-18 Well Mode changed to Pumping
1966-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-14 Perforation Treatment Performed - Jet Perforation
1967-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-07 Plug Back Performed
1997-08-07 Well Fluid changed to Crude Oil
1997-08-07 Well Log Performed
1997-08-07 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-12 Hydra Jet Perforation 1299.10 1299.10 0
1965-11-12 Acid Treatment 1299.10 1299.10 0
1965-11-12 Fracture 1299.10 1299.10 0
1966-10-14 Perforation 1277.40 1278.30 7
1966-10-14 Perforation 1297.80 1302.40 7
1966-10-14 Acid Treatment 1277.40 1302.40 0
1967-06-30 Acid Treatment 1277.40 1278.30 0
1997-08-07 Packing Device Capped w/Cement 1266.00 1274.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6688 0.0 0.0 0.0
1968 8212 0.0 0.0 0.0
1969 7032 0.0 0.0 0.0
1970 6684 0.0 0.0 0.0
1971 6736 0.0 0.0 0.0
1972 7888 0.0 0.0 0.0
1973 7197 0.0 0.0 0.0
1974 7418 0.0 0.0 0.0
1975 8292 0.0 0.0 0.0
1976 6534 0.0 0.0 0.0
1977 6098 0.0 0.0 0.0
1978 8490 0.0 0.0 0.0
1979 8546 0.0 0.0 0.0
1980 7029 0.0 0.0 0.0
1981 7015 0.0 0.0 0.0
1982 8577 0.0 0.0 0.0
1983 8331 0.0 0.0 0.0
1984 8501 0.0 0.0 0.0
1985 8564 0.0 0.0 0.0
1986 7965 0.0 0.0 0.0
1987 8679 0.0 0.0 0.0
1988 8625 0.0 0.0 0.0
1989 8610 0.0 0.0 0.0
1990 8312 0.0 0.0 0.0
1991 8740 0.0 0.0 0.0
1992 8519 0.0 0.0 0.0
1993 8532 0.0 0.0 0.0
1994 8583 0.0 0.0 0.0
1995 8702 0.0 0.0 0.0
1996 7306 0.0 0.0 0.0
1997 4777 0.0 0.0 0.0

For data sources see[5]

References