X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080506000

Well Details

Well ID: 0885080506000
Loading map...
Location: 00/06-05-088-08W5/0
Location Alias: 00/06-05-88-08 W5M
Location Alias 2: 00/06-05-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 05
County/Municipality: Municipal District of Opportunity No. 17
Well Name: NUMAC ET AL RED EARTH 6-5-88-8
Operator Name: Devon Canada Corporation
License Number: 0080587
License Date: 1980-01-22
License Status: RecCertified
Spud Date: 1980-03-02
Final Drill Date: 1980-03-22
Well Total Depth: 1355.20 m
Surface Hole Latitude: 56.602693
Surface Hole Longitude: -115.240196

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-22 Obtained License
1980-03-02 Lost Circulation Occurred
1980-03-09 Lost Circulation Occurred
1980-03-13 Kick Occurred
1980-03-20 Lost Circulation Occurred
1980-03-22 Finished Drilling
1980-03-22 Well Mode changed to Drilled and Cased
1980-03-30 Production Casing Operation Performed
1980-04-02 Perforation Treatment Performed - Jet Perforation
1980-04-03 Perforation Treatment Performed - Fractured
1980-09-04 Well Began Injection
1980-09-04 Well Fluid changed to Water
1980-09-04 Well Type changed to Injection
1987-08-17 Well Fluid changed to Water
1987-08-17 Well Mode changed to Suspended
1987-08-17 Well Type changed to Injection
1992-02-15 Well Log Performed
1992-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-17 Plug Back Performed
1992-02-17 Well Fluid changed to Water
1992-02-17 Well Mode changed to Abandoned
1992-02-17 Well Type changed to Injection
1992-02-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-02 Perforation 1319.30 1324.30 13
1980-04-02 Perforation 1308.00 1308.60 13
1980-04-02 Perforation 1302.30 1307.00 13
1980-04-02 Perforation 1296.00 1298.00 13
1980-04-03 Fracture 1296.00 1324.30 0
1992-02-17 Packing Device Capped w/Cement 1260.00 1268.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-02 Lost Circulation 16.00 41.00
1980-03-09 Lost Circulation 434.20 577.00
1980-03-13 Kick 876.00 876.00
1980-03-20 Lost Circulation 1288.00 1302.00

For data sources see[6]

References