X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080301000

Well Details

Well ID: 0885080301000
Loading map...
Location: 00/01-03-088-08W5/0
Location Alias: 00/01-03-88-08 W5M
Location Alias 2: 00/01-03-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 03
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PPR REDEARTH 1-3-88-8
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0447496
License Date: 2012-08-01
License Status: Issued
Spud Date: 2012-09-10
Final Drill Date: 2012-10-01
Well Total Depth: 2912.00 m
Surface Hole Latitude: 56.597845
Surface Hole Longitude: -115.201281

For data sources see[1][2]

Well History

Date Event
2012-08-01 Obtained License
2012-09-10 Surface Casing Operation Performed
2012-09-16 Direction Drilling Operation Performed - Horizontal
2012-09-20 Intermediate Casing Operation Performed
2012-09-23 Well Log Performed
2012-10-01 Finished Drilling
2012-10-01 Well Log Performed
2012-10-01 Well Mode changed to Drilled and Cased
2012-10-04 Liner Casing Operation Performed
2012-10-05 Rig Released
2012-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-08 Well Began Production
2012-11-08 Well Fluid changed to Crude Oil
2012-11-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-10 Precision Drilling Corporation 327 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-16 1052.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-12 Multi-Stage Fracture 2862.10 2862.20 0
2012-10-12 Multi-Stage Fracture 2222.80 2222.90 0
2012-10-12 Multi-Stage Fracture 2153.10 2153.20 0
2012-10-12 Multi-Stage Fracture 2074.80 2074.90 0
2012-10-12 Multi-Stage Fracture 1983.40 1983.50 0
2012-10-12 Multi-Stage Fracture 1906.10 1906.20 0
2012-10-13 Multi-Stage Fracture 1842.30 1842.40 0
2012-10-13 Multi-Stage Fracture 1763.50 1763.60 0
2012-10-13 Multi-Stage Fracture 1686.40 1686.50 0
2012-10-13 Multi-Stage Fracture 1619.80 1619.90 0
2012-10-12 Multi-Stage Fracture 2791.40 2791.50 0
2012-10-12 Multi-Stage Fracture 2721.50 2721.60 0
2012-10-12 Multi-Stage Fracture 2651.20 2651.30 0
2012-10-12 Multi-Stage Fracture 2576.60 2576.70 0
2012-10-12 Multi-Stage Fracture 2508.90 2509.00 0
2012-10-12 Multi-Stage Fracture 2437.80 2437.90 0
2012-10-12 Multi-Stage Fracture 2366.60 2366.70 0
2012-10-12 Multi-Stage Fracture 2289.70 2289.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1290 0.0 0.0 0.0
2013 7147 0.0 0.0 0.0
2014 8198 0.0 0.0 0.0
2015 7500 0.0 0.0 0.0
2016 8603 0.0 0.0 0.0
2017 8366 0.0 0.0 0.0
2018 8366 0.0 0.0 0.0
2019 7982 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References