X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885063507002

Well Details

Well ID: 0885063507002
Loading map...
Location: 00/07-35-088-06W5/2
Location Alias: 00/07-35-88-06 W5M
Location Alias 2: 00/07-35-088-06 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 06
Section: 35
County/Municipality: Municipal District of Opportunity No. 17
Well Name: UNOCAL RED EARTH 7-35-88-6
Operator Name: Chevron Canada Properties Limited
License Number: 0127799
License Date: 1987-08-10
License Status: RecCertified
Spud Date: 1987-08-22
Final Drill Date: 1987-09-26
Well Total Depth: 1515.00 m
Surface Hole Latitude: 56.672765
Surface Hole Longitude: -114.836415

For data sources see[1][2]

Well History

Date Event
1987-08-10 Obtained License
1987-08-25 Surface Casing Operation Performed
1987-08-30 Intermediate Casing Operation Performed
1987-09-13 Direction Drilling Operation Performed - Deviate
1987-09-26 Finished Drilling
1987-09-26 Well Log Performed
1987-09-26 Well Mode changed to Drilled and Cased
1987-09-28 Drill Stem Test Performed
1987-09-28 Well Log Performed
1987-09-30 Liner Casing Operation Performed
1987-09-30 Rig Released
1987-10-16 Perforation Treatment Performed - Jet Perforation
1987-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-09 Well Began Production
1987-11-09 Well Fluid changed to Crude Oil
1987-11-09 Well Mode changed to Pumping
1987-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-08 Well Fluid changed to Crude Oil
1989-02-08 Well Mode changed to Suspended
1991-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-05-24 Plug Back Performed
1991-05-24 Well Fluid changed to Crude Oil
1991-05-24 Well Mode changed to Abandoned
1991-07-30 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-09-13 1169.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-16 Perforation 1488.00 1489.50 24
1987-10-16 Perforation 1491.50 1494.50 24
1987-10-17 Acid Treatment 1488.00 1494.50 0
1987-12-15 Acid Treatment 1488.00 1494.50 0
1991-05-24 Packing Device Capped w/Cement 1472.00 1480.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 804 0.0 0.0 0.0
1988 5626 0.0 0.0 0.0
1989 741 0.0 0.0 0.0

For data sources see[6]

References