X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0884171206000

Well Details

Well ID: 0884171206000
Loading map...
Location: 00/06-12-088-17W4/0
Location Alias: 00/06-12-88-17 W4M
Location Alias 2: 00/06-12-088-17 W4/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 4
Range: 17
Section: 12
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: RENAISSANCE SALESKI 6-12-88-17
Operator Name: Sequoia Resources Corp.
License Number: 0094534
License Date: 1982-01-15
License Status: Suspension
Spud Date: 1982-01-22
Final Drill Date: 1982-01-24
Well Total Depth: 255.00 m
Surface Hole Latitude: 56.615337
Surface Hole Longitude: -112.573658

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-15 Obtained License
1982-01-24 Finished Drilling
1982-01-24 Perforation Treatment Performed - Open-Hole Completion
1982-01-24 Production Casing Operation Performed
1982-02-01 Well Mode changed to Drilled and Cased
1982-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-01 Perforation Treatment Performed - Jet Perforation
1982-03-11 Perforation Treatment Performed - Cement Squeeze
1982-03-12 Perforation Treatment Performed - Cement Squeeze
1982-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-13 Perforation Treatment Performed - Jet Perforation
1982-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-24 Well Began Production
2002-01-24 Well Fluid changed to Gas
2002-01-24 Well Mode changed to Flowing
2012-11-27 Well Fluid changed to Gas
2012-11-27 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-24 Open Hole/Barefoot Completion 247.00 255.00 0
1982-02-03 Acid Treatment 247.00 255.00 0
1982-03-01 Perforation 236.00 239.50 13
1982-03-11 Cement Squeeze 236.00 239.50 0
1982-03-12 Cement Squeeze 236.00 239.50 0
1982-03-13 Packing Device Capped w/Cement 242.50 243.00 0
1982-03-13 Perforation 237.50 238.50 13
1982-03-15 Acid Treatment 237.50 238.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 112 0.0 0.0 0.0
2002 8123 0.0 0.0 0.0
2003 8567 0.0 0.0 0.0
2004 8391 0.0 0.0 0.0
2005 8146 0.0 0.0 0.0
2006 8259 0.0 0.0 0.0
2007 8505 0.0 0.0 0.0
2008 6575 0.0 0.0 0.0
2009 1166 0.0 0.0 0.0
2011 6598 0.0 0.0 0.0
2012 7319 0.0 0.0 0.0

For data sources see[5]

References