If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0876081804032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.540932,"lon":-119.306079,"icon":""}]} |
| Location: 03/04-18-087-08W6/2 | |
| Location Alias: 03/04-18-87-08 W6M | |
| Location Alias 2: 03/04-18-087-08 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 18 | |
| County/Municipality: Clear Hills County | |
| Well Name: BIRCHCLIFF 2HZ WORSLEY 4-18-87-8 | |
| Operator Name: Enercapita Energy Ltd. | |
| License Number: 0429675 | |
| License Date: 2011-01-10 | |
| License Status: Amended | |
| Spud Date: 2011-02-24 | |
| Final Drill Date: 2011-03-14 | |
| Well Total Depth: 2915.00 m | |
| Surface Hole Latitude: 56.540932 | |
| Surface Hole Longitude: -119.306079 |
| Date | Event |
|---|---|
| 2011-01-10 | Obtained License |
| 2011-02-25 | Surface Casing Operation Performed |
| 2011-02-27 | Direction Drilling Operation Performed - Horizontal |
| 2011-03-01 | Intermediate Casing Operation Performed |
| 2011-03-09 | Direction Drilling Operation Performed - Horizontal |
| 2011-03-14 | Finished Drilling |
| 2011-03-14 | Well Structure changed to Drain |
| 2011-03-16 | Rig Released |
| 2011-03-23 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-27 | 857.80 | Horizontal |
| 2011-03-09 | 1229.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-23 | Open Hole/Barefoot Completion | 1229.00 | 2915.00 | 0 |
For data sources see[5]