X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0876073304000

Well Details

Well ID: 0876073304000
Loading map...
Location: 00/04-33-087-07W6/0
Location Alias: 00/04-33-87-07 W6M
Location Alias 2: 00/04-33-087-07 W6/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 6
Range: 07
Section: 33
County/Municipality: Clear Hills County
Well Name: CNRL WORSLEY 4-33-87-7
Operator Name: Canadian Natural Resources Limited
License Number: 0055559
License Date: 1975-10-27
License Status: Issued
Spud Date: 1975-10-29
Final Drill Date: 1975-11-25
Well Total Depth: 2345.40 m
Surface Hole Latitude: 56.583906
Surface Hole Longitude: -119.064228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-27 Obtained License
1975-11-25 Finished Drilling
1975-11-25 Well Mode changed to Drilled and Cased
1975-11-26 Well Log Performed
1975-11-29 Production Casing Operation Performed
1975-12-21 Perforation Treatment Performed - Jet Perforation
1975-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-03 Well Began Production
1976-11-03 Well Fluid changed to Gas
1976-11-03 Well Mode changed to Flowing
1981-09-17 Perforation Treatment Performed - Jet Perforation
1981-09-19 Perforation Treatment Performed - Cement Squeeze
1981-09-22 Perforation Treatment Performed - Jet Perforation
1983-08-01 Well Fluid changed to Gas
1983-08-01 Well Mode changed to Suspended
1985-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-11 Plug Back Performed
1985-04-11 Well Fluid changed to Gas
1985-04-11 Well Mode changed to Abandoned Zone
1985-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-28 Perforation Treatment Performed - Jet Perforation
1993-06-16 Well Log Performed
1993-06-18 Perforation Treatment Performed - Jet Perforation
1993-06-18 Well Log Performed
1993-06-19 Perforation Treatment Performed - Fractured
1993-06-20 Well Log Performed
1996-06-18 Well Log Performed
1996-06-19 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-21 Perforation 2257.30 2260.40 7
1993-06-18 Perforation 1042.40 1044.20 13
1993-06-19 Fracture 1042.40 1044.20 0
1996-06-19 Perforation 1033.00 1038.70 20
1975-12-22 Acid Treatment 2257.30 2260.40 0
1981-09-17 Perforation 2264.70 2266.70 7
1981-09-19 Cement Squeeze 2257.30 2260.40 0
1981-09-22 Perforation 2254.00 2255.50 0
1981-09-22 Perforation 2256.40 2257.70 0
1985-04-11 Packing Device Capped w/Cement 2223.00 2230.00 0
1985-08-28 Perforation 1024.70 1029.30 13
1985-08-28 Acid Treatment 1024.70 1029.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1392 0.0 0.0 0.0
1977 7949 0.0 0.0 0.0
1978 8451 0.0 0.0 0.0
1979 8755 0.0 0.0 0.0
1980 8045 0.0 0.0 0.0
1981 6851 0.0 0.0 0.0
1982 3302 0.0 0.0 0.0
1983 3030 0.0 0.0 0.0

For data sources see[5]

References