If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0876071002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.525303,"lon":-119.023266,"icon":""}]} |
| Location: 00/02-10-087-07W6/0 | |
| Location Alias: 00/02-10-87-07 W6M | |
| Location Alias 2: 00/02-10-087-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 10 | |
| County/Municipality: Clear Hills County | |
| Well Name: CNRES WORSLEY 2-10-87-7 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0257267 | |
| License Date: 2001-07-11 | |
| License Status: Abandoned | |
| Spud Date: 2001-07-24 | |
| Final Drill Date: 2001-07-27 | |
| Well Total Depth: 1070.00 m | |
| Surface Hole Latitude: 56.525303 | |
| Surface Hole Longitude: -119.023266 |
| Date | Event |
|---|---|
| 2001-07-11 | Obtained License |
| 2001-07-25 | Surface Casing Operation Performed |
| 2001-07-27 | Finished Drilling |
| 2001-07-27 | Well Log Performed |
| 2001-07-28 | Production Casing Operation Performed |
| 2001-07-29 | Rig Released |
| 2001-07-29 | Well Mode changed to Drilled and Cased |
| 2001-08-12 | Well Log Performed |
| 2001-08-13 | Perforation Treatment Performed - Jet Perforation |
| 2001-08-13 | Well Log Performed |
| 2001-09-18 | Well Began Production |
| 2001-09-18 | Well Fluid changed to Gas |
| 2001-09-18 | Well Mode changed to Flowing |
| 2002-12-07 | Perforation Treatment Performed - Jet Perforation |
| 2002-12-07 | Well Log Performed |
| 2002-12-09 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 2002-12-09 | Plug Back Performed |
| 2002-12-09 | Well Fluid changed to Gas |
| 2002-12-09 | Well Log Performed |
| 2002-12-09 | Well Mode changed to Abandoned Zone |
| 2002-12-10 | Perforation Treatment Performed - Jet Perforation |
| 2002-12-10 | Well Log Performed |
| 2002-12-12 | Perforation Treatment Performed - Fractured |
| 2011-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-20 | Plug Back Performed |
| 2011-02-20 | Well Log Performed |
| 2011-03-04 | Well Abandoned |
| 2012-07-26 | Well Log Performed |
| 2012-07-27 | Well Log Performed |
| 2012-07-30 | Perforation Treatment Performed - Jet Perforation |
| 2012-07-30 | Well Log Performed |
| 2012-07-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-07-31 | Perforation Treatment Performed - Remedial Casing |
| 2012-07-31 | Well Log Performed |
| 2015-08-26 | Perforation Treatment Performed - Jet Perforation |
| 2015-08-26 | Well Log Performed |
| 2015-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-08-27 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-08-13 | Perforation | 1005.00 | 1015.00 | 20 |
| 2012-07-31 | Remedial Casing Cementing | 348.00 | 349.00 | 0 |
| 2012-07-31 | Packing Device Capped w/Cement | 318.00 | 336.40 | 0 |
| 2015-08-26 | Perforation | 258.00 | 260.00 | 16 |
| 2015-08-27 | Remedial Casing Cementing | 258.00 | 260.00 | 0 |
| 2015-08-27 | Packing Device Capped w/Cement | 240.00 | 253.00 | 0 |
| 2001-08-13 | Perforation | 1017.50 | 1020.00 | 20 |
| 2002-12-07 | Perforation | 1025.00 | 1028.00 | 13 |
| 2002-12-09 | Packing Dev Cpd w/Res-Gyp Cem | 1000.50 | 1003.50 | 0 |
| 2002-12-10 | Perforation | 988.50 | 989.50 | 17 |
| 2002-12-10 | Perforation | 990.00 | 995.00 | 17 |
| 2002-12-12 | Fracture | 988.50 | 995.00 | 0 |
| 2011-02-20 | Packing Device Capped w/Cement | 971.80 | 980.00 | 0 |
| 2012-07-30 | Perforation | 348.00 | 349.00 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 2472 | 0.0 | 0.0 | 0.0 |
| 2002 | 2582 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-12-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]