X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0876040816002

Well Details

Well ID: 0876040816002
Loading map...
Location: 00/16-08-087-04W6/2
Location Alias: 00/16-08-87-04 W6M
Location Alias 2: 00/16-08-087-04 W6/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 6
Range: 04
Section: 08
County/Municipality: Clear Hills County
Well Name: CNRL WORSLEY 16-8-87-4
Operator Name: Canadian Natural Resources Limited
License Number: 0156961
License Date: 1993-03-03
License Status: Abandoned
Spud Date: 1993-03-25
Final Drill Date: 1993-04-05
Well Total Depth: 2280.00 m
Surface Hole Latitude: 56.534384
Surface Hole Longitude: -118.589487

For data sources see[1][2]

Well History

Date Event
1993-03-03 Obtained License
1993-03-26 Surface Casing Operation Performed
1993-04-05 Finished Drilling
1993-04-05 Well Log Performed
1993-04-05 Well Mode changed to Drilled and Cased
1993-04-06 Drill Stem Test Performed
1993-04-07 Drill Stem Test Performed
1993-04-09 Production Casing Operation Performed
1993-04-09 Rig Released
1993-11-10 Well Log Performed
1993-11-12 Well Log Performed
1993-11-13 Perforation Treatment Performed - Jet Perforation
1994-08-31 Perforation Treatment Performed - Cement Squeeze
1994-08-31 Plug Back Performed
1994-09-03 Perforation Treatment Performed - Jet Perforation
1994-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-07 Perforation Treatment Performed - Jet Perforation
1996-09-20 Well Log Performed
1996-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-21 Perforation Treatment Performed - Jet Perforation
1996-09-21 Plug Back Performed
1996-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-23 Perforation Treatment Performed - Jet Perforation
1996-09-23 Well Log Performed
1996-09-24 Perforation Treatment Performed - Cement Squeeze
1996-09-24 Plug Back Performed
1996-09-26 Perforation Treatment Performed - Jet Perforation
1996-09-26 Well Log Performed
1996-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-29 Well Log Performed
1996-10-01 Well Began Production
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Pumping
2005-06-01 Well Fluid changed to Crude Oil
2005-06-01 Well Mode changed to Suspended
2005-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-07 Plug Back Performed
2005-11-07 Well Fluid changed to Crude Oil
2005-11-07 Well Mode changed to Abandoned Zone
2005-11-15 Well Abandoned
2005-11-15 Well Fluid changed to Crude Oil
2005-11-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-13 Perforation 1075.00 1080.00 7
1996-09-22 Acid Treatment 1155.50 1158.50 0
1996-09-23 Perforation 1164.00 1165.00 20
1996-09-24 Cement Squeeze 1155.50 1165.00 0
1996-09-26 Perforation 1155.50 1156.50 20
1996-09-27 Acid Treatment 1155.50 1156.50 0
1996-09-29 Perforation 1157.50 1158.50 20
2005-11-07 Packing Device Capped w/Cement 1142.00 1152.00 0
1994-08-31 Cement Squeeze 1075.00 1080.00 0
1994-09-03 Perforation 2219.70 2221.20 21
1994-09-04 Acid Treatment 2219.70 2221.20 0
1994-09-07 Perforation 2221.00 2222.50 13
1994-09-07 Acid Treatment 2221.00 2222.50 0
1996-09-21 Packing Device Capped w/Cement 2199.00 2207.00 0
1996-09-21 Perforation 1155.50 1156.50 20
1996-09-21 Perforation 1157.50 1158.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1479 0.0 0.0 0.0
1997 8374 0.0 0.0 0.0
1998 8509 0.0 0.0 0.0
1999 8269 0.0 0.0 0.0
2000 6977 0.0 0.0 0.0
2001 4934 0.0 0.0 0.0

For data sources see[5]

References