If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0876021909002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.559878,"lon":-118.295599,"icon":""}]} |
| Location: 00/09-19-087-02W6/2 | |
| Location Alias: 00/09-19-87-02 W6M | |
| Location Alias 2: 00/09-19-087-02 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 6 | |
| Range: 02 | |
| Section: 19 | |
| County/Municipality: Clear Hills County | |
| Well Name: SYDCO BEATON 9-19-87-2 | |
| Operator Name: Sydco Energy Inc. | |
| License Number: 0045128 | |
| License Date: 1973-02-15 | |
| License Status: Abandoned | |
| Spud Date: 1973-02-23 | |
| Final Drill Date: 1973-03-13 | |
| Well Total Depth: 1976.30 m | |
| Surface Hole Latitude: 56.559878 | |
| Surface Hole Longitude: -118.295599 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1973-02-15 | Obtained License |
| 1973-02-28 | Drill Stem Test Performed |
| 1973-03-02 | Drill Stem Test Performed |
| 1973-03-03 | Lost Circulation Occurred |
| 1973-03-13 | Finished Drilling |
| 1973-03-13 | Well Mode changed to Drilled and Cased |
| 1973-03-14 | Drill Stem Test Performed |
| 1973-03-14 | Lost Circulation Occurred |
| 1973-03-19 | Production Casing Operation Performed |
| 1973-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1973-03-21 | Perforation Treatment Performed - Cement Squeeze |
| 1973-03-21 | Perforation Treatment Performed - Jet Perforation |
| 1973-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1976-09-28 | Perforation Treatment Performed - Cement Squeeze |
| 1976-09-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1977-08-13 | Well Began Production |
| 1977-08-13 | Well Fluid changed to Gas |
| 1977-08-13 | Well Mode changed to Flowing |
| 1979-03-29 | Well Fluid changed to Gas |
| 1979-03-29 | Well Mode changed to Suspended |
| 1982-05-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-05-16 | Perforation Treatment Performed - Jet Perforation |
| 1982-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-05-17 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-06 | Perforation Treatment Performed - Cement Squeeze |
| 1990-09-08 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-08 | Well Log Performed |
| 1990-09-09 | Well Log Performed |
| 1990-09-10 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-11 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-11 | Well Log Performed |
| 2005-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-03-16 | Plug Back Performed |
| 2005-03-16 | Well Log Performed |
| 2005-03-30 | Perforation Treatment Performed - Cement Squeeze |
| 2005-03-30 | Perforation Treatment Performed - Jet Perforation |
| 2005-03-30 | Well Fluid changed to Gas |
| 2005-03-30 | Well Mode changed to Abandoned Zone |
| 2005-03-31 | Well Log Performed |
| 2005-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-04-06 | Plug Back Performed |
| 2005-04-06 | Well Abandoned |
| 2005-04-06 | Well Fluid changed to Gas |
| 2005-04-06 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1973-03-20 | Perforation | 843.10 | 843.70 | 13 |
| 1982-05-17 | Perforation | 831.50 | 833.30 | 13 |
| 1982-05-17 | Acid Treatment | 831.50 | 838.40 | 0 |
| 1990-09-06 | Cement Squeeze | 811.70 | 851.00 | 0 |
| 1990-09-08 | Perforation | 845.50 | 847.00 | 13 |
| 1990-09-10 | Perforation | 837.00 | 838.20 | 13 |
| 1990-09-11 | Perforation | 811.60 | 812.60 | 13 |
| 2005-03-16 | Packing Device Capped w/Cement | 789.00 | 797.00 | 0 |
| 2005-03-30 | Perforation | 777.00 | 778.00 | 17 |
| 2005-03-30 | Cement Squeeze | 777.00 | 778.00 | 0 |
| 2005-04-06 | Packing Device Capped w/Cement | 137.00 | 145.00 | 0 |
| 1973-03-20 | Perforation | 837.30 | 837.90 | 13 |
| 1973-03-21 | Perforation | 850.40 | 851.00 | 13 |
| 1973-03-21 | Cement Squeeze | 843.10 | 851.00 | 0 |
| 1973-03-22 | Perforation | 812.00 | 812.90 | 13 |
| 1976-09-28 | Cement Squeeze | 812.00 | 812.90 | 0 |
| 1976-09-29 | Hydra Jet Perforation | 811.70 | 812.70 | 0 |
| 1982-05-16 | Perforation | 837.20 | 838.40 | 13 |
| 1982-05-16 | Acid Treatment | 837.20 | 838.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1977 | 1463 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1973-03-03 | Lost Circulation | 978.40 | 1168.90 |
| 1973-03-14 | Lost Circulation | 1976.30 | 1976.30 |
For data sources see[6]