X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0876021909000

Well Details

Well ID: 0876021909000
Loading map...
Location: 00/09-19-087-02W6/0
Location Alias: 00/09-19-87-02 W6M
Location Alias 2: 00/09-19-087-02 W6/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 6
Range: 02
Section: 19
County/Municipality: Clear Hills County
Well Name: SYDCO BEATON 9-19-87-2
Operator Name: Sydco Energy Inc.
License Number: 0045128
License Date: 1973-02-15
License Status: Abandoned
Spud Date: 1973-02-23
Final Drill Date: 1973-03-13
Well Total Depth: 1976.30 m
Surface Hole Latitude: 56.559878
Surface Hole Longitude: -118.295599

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-15 Obtained License
1973-02-28 Drill Stem Test Performed
1973-03-02 Drill Stem Test Performed
1973-03-03 Lost Circulation Occurred
1973-03-13 Finished Drilling
1973-03-14 Drill Stem Test Performed
1973-03-14 Lost Circulation Occurred
1973-03-19 Production Casing Operation Performed
1973-03-20 Perforation Treatment Performed - Jet Perforation
1973-03-20 Well Mode changed to Drilled and Cased
1973-03-21 Perforation Treatment Performed - Cement Squeeze
1973-03-21 Perforation Treatment Performed - Jet Perforation
1973-03-22 Perforation Treatment Performed - Jet Perforation
1976-09-28 Perforation Treatment Performed - Cement Squeeze
1976-09-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-08-13 Well Mode changed to Drilled and Cased
1982-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-16 Perforation Treatment Performed - Jet Perforation
1982-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-17 Perforation Treatment Performed - Jet Perforation
1990-09-06 Perforation Treatment Performed - Cement Squeeze
1990-09-08 Perforation Treatment Performed - Jet Perforation
1990-09-08 Well Log Performed
1990-09-09 Well Log Performed
1990-09-10 Perforation Treatment Performed - Jet Perforation
1990-09-11 Perforation Treatment Performed - Jet Perforation
1990-09-11 Well Log Performed
2005-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-16 Plug Back Performed
2005-03-16 Well Log Performed
2005-03-16 Well Mode changed to Abandoned Zone
2005-03-30 Perforation Treatment Performed - Cement Squeeze
2005-03-30 Perforation Treatment Performed - Jet Perforation
2005-03-31 Well Log Performed
2005-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-06 Plug Back Performed
2005-04-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-03-20 Perforation 843.10 843.70 13
1982-05-17 Perforation 831.50 833.30 13
1982-05-17 Acid Treatment 831.50 838.40 0
1990-09-06 Cement Squeeze 811.70 851.00 0
1990-09-08 Perforation 845.50 847.00 13
1990-09-10 Perforation 837.00 838.20 13
1990-09-11 Perforation 811.60 812.60 13
2005-03-16 Packing Device Capped w/Cement 789.00 797.00 0
2005-03-30 Perforation 777.00 778.00 17
2005-03-30 Cement Squeeze 777.00 778.00 0
2005-04-06 Packing Device Capped w/Cement 137.00 145.00 0
1973-03-20 Perforation 837.30 837.90 13
1973-03-21 Perforation 850.40 851.00 13
1973-03-21 Cement Squeeze 843.10 851.00 0
1973-03-22 Perforation 812.00 812.90 13
1976-09-28 Cement Squeeze 812.00 812.90 0
1976-09-29 Hydra Jet Perforation 811.70 812.70 0
1982-05-16 Perforation 837.20 838.40 13
1982-05-16 Acid Treatment 837.20 838.40 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-03-03 Lost Circulation 978.40 1168.90
1973-03-14 Lost Circulation 1976.30 1976.30

For data sources see[5]

References