X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875131405000

Well Details

Well ID: 0875131405000
Loading map...
Location: 00/05-14-087-13W5/0
Location Alias: 00/05-14-87-13 W5M
Location Alias 2: 00/05-14-087-13 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 13
Section: 14
County/Municipality: Northern Sunrise County
Well Name: HARVEST EVI 5-14-87-13
Operator Name: Harvest Operations Corp.
License Number: 0161297
License Date: 1993-10-01
License Status: Suspension
Spud Date: 1993-10-04
Final Drill Date: 1993-10-19
Well Total Depth: 1671.00 m
Surface Hole Latitude: 56.542881
Surface Hole Longitude: -115.965405

For data sources see[1][2]

Well History

Date Event
1993-10-01 Obtained License
1993-10-06 Surface Casing Operation Performed
1993-10-09 Lost Circulation Occurred
1993-10-11 Lost Circulation Occurred
1993-10-19 Finished Drilling
1993-10-19 Well Mode changed to Drilled and Cased
1993-10-20 Drill Stem Test Performed
1993-10-20 Well Log Performed
1993-10-21 Drill Stem Test Performed
1993-10-22 Drill Stem Test Performed
1993-10-23 Production Casing Operation Performed
1993-10-23 Rig Released
1993-12-01 Well Log Performed
1993-12-02 Perforation Treatment Performed - Jet Perforation
1993-12-15 Well Began Production
1993-12-15 Well Fluid changed to Crude Oil
1993-12-15 Well Mode changed to Pumping
1998-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-06 Plug Back Performed
1998-12-06 Well Fluid changed to Crude Oil
1998-12-06 Well Mode changed to Abandoned Zone
1998-12-07 Perforation Treatment Performed - Jet Perforation
1998-12-07 Well Log Performed
1998-12-08 Perforation Treatment Performed - Jet Perforation
1998-12-08 Well Log Performed
1998-12-09 Perforation Treatment Performed - Cement Squeeze
1998-12-10 Perforation Treatment Performed - Cement Squeeze
1998-12-11 Perforation Treatment Performed - Cement Squeeze
1998-12-15 Perforation Treatment Performed - Jet Perforation
1998-12-16 Well Log Performed
1999-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-02 Perforation 1590.50 1592.50 13
1998-12-15 Perforation 1159.00 1163.00 13
1998-12-15 Perforation 1142.00 1146.00 13
1999-04-23 Acid Treatment 1142.00 1170.00 0
1999-08-06 Acid Treatment 1142.00 1170.00 0
1999-10-10 Acid Treatment 1142.00 1170.00 0
1999-11-17 Acid Treatment 1142.00 1170.00 0
2000-01-05 Acid Treatment 1142.00 1170.00 0
2000-02-21 Acid Treatment 1142.00 1170.00 0
2000-04-13 Acid Treatment 1142.00 1170.00 0
2000-05-21 Acid Treatment 1142.00 1170.00 0
1998-12-06 Packing Device Capped w/Cement 1577.00 1585.00 0
2000-06-30 Acid Treatment 1142.00 1170.00 0
2000-09-07 Acid Treatment 1142.00 1170.00 0
2000-09-10 Acid Treatment 1142.00 1170.00 0
2000-11-07 Acid Treatment 1142.00 1170.00 0
2001-02-03 Acid Treatment 1142.00 1170.00 0
2001-02-22 Acid Treatment 1142.00 1170.00 0
2001-04-04 Acid Treatment 1142.00 1170.00 0
2001-04-17 Acid Treatment 1142.00 1170.00 0
2001-06-28 Acid Treatment 1142.00 1170.00 0
2001-08-07 Acid Treatment 1142.00 1170.00 0
1998-12-07 Perforation 1200.00 1201.00 13
2001-09-15 Acid Treatment 1142.00 1170.00 0
2001-10-14 Acid Treatment 1142.00 1170.00 0
2001-11-12 Acid Treatment 1142.00 1170.00 0
2001-11-28 Acid Treatment 1142.00 1170.00 0
2001-12-20 Acid Treatment 1142.00 1170.00 0
2002-01-10 Acid Treatment 1142.00 1170.00 0
2002-02-13 Acid Treatment 1142.00 1170.00 0
2002-04-11 Acid Treatment 1142.00 1170.00 0
2002-05-14 Acid Treatment 1142.00 1170.00 0
2002-07-08 Acid Treatment 1142.00 1170.00 0
1998-12-07 Perforation 1120.00 1121.00 13
2002-08-20 Acid Treatment 1142.00 1170.00 0
2002-10-30 Acid Treatment 1142.00 1170.00 0
2002-11-18 Acid Treatment 1142.00 1170.00 0
2002-12-05 Acid Treatment 1142.00 1170.00 0
2003-01-03 Acid Treatment 1142.00 1170.00 0
2003-02-06 Acid Treatment 1142.00 1170.00 0
2003-02-18 Acid Treatment 1142.00 1170.00 0
2003-03-19 Acid Treatment 1142.00 1170.00 0
2003-04-11 Acid Treatment 1142.00 1170.00 0
2003-10-20 Acid Treatment 1142.00 1170.00 0
1998-12-08 Perforation 1195.90 1196.90 13
2003-11-03 Acid Treatment 1142.00 1170.00 0
2005-03-08 Acid Treatment 1142.00 1170.00 0
2006-06-26 Acid Treatment 1142.00 1170.00 0
2007-01-04 Acid Treatment 1142.00 1170.00 0
2007-03-02 Acid Treatment 1142.00 1170.00 0
2007-04-13 Acid Treatment 1142.00 1170.00 0
2007-06-16 Acid Treatment 1142.00 1170.00 0
2007-08-14 Acid Treatment 1142.00 1170.00 0
2008-03-20 Acid Treatment 1142.00 1170.00 0
1998-12-09 Cement Squeeze 1200.00 1201.00 0
1998-12-10 Cement Squeeze 1195.90 1196.90 0
1998-12-11 Cement Squeeze 1120.00 1121.00 0
1998-12-15 Perforation 1165.00 1170.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 377 0.0 0.0 0.0
1994 5791 0.0 0.0 0.0
1995 6463 0.0 0.0 0.0
1996 8695 0.0 0.0 0.0
1997 8555 0.0 0.0 0.0
1998 3859 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-10-09 Lost Circulation 1110.00 1149.00
1993-10-11 Lost Circulation 1525.00 1525.00

For data sources see[6]

References