X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875113203020

Well Details

Well ID: 0875113203020
Loading map...
Location: 02/03-32-087-11W5/0
Location Alias: 02/03-32-87-11 W5M
Location Alias 2: 02/03-32-087-11 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 11
Section: 32
County/Municipality: Northern Sunrise County
Well Name: PPR 102 EVI 3-32-87-11
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0431409
License Date: 2011-02-10
License Status: Issued
Spud Date: 2011-10-05
Final Drill Date: 2011-10-20
Well Total Depth: 3025.00 m
Surface Hole Latitude: 56.583326
Surface Hole Longitude: -115.745978

For data sources see[1][2]

Well History

Date Event
2011-02-10 Obtained License
2011-10-07 Surface Casing Operation Performed
2011-10-10 Direction Drilling Operation Performed - Horizontal
2011-10-20 Finished Drilling
2011-10-20 Well Mode changed to Drilled and Cased
2011-10-22 Production Casing Operation Performed
2011-10-23 Rig Released
2011-10-25 Well Log Performed
2011-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-08 Well Began Production
2011-12-08 Well Fluid changed to Crude Oil
2011-12-08 Well Mode changed to Pumping
2014-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-10 1203.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-06 Multi-Stage Fracture 3009.00 3009.10 0
2011-11-07 Multi-Stage Fracture 2474.50 2474.60 0
2011-11-07 Multi-Stage Fracture 2414.60 2414.70 0
2011-11-07 Multi-Stage Fracture 2367.60 2367.70 0
2011-11-07 Multi-Stage Fracture 2308.20 2308.30 0
2011-11-07 Multi-Stage Fracture 2262.70 2262.80 0
2011-11-07 Multi-Stage Fracture 2203.40 2203.50 0
2011-11-07 Multi-Stage Fracture 2153.90 2154.00 0
2011-11-07 Multi-Stage Fracture 2104.40 2104.50 0
2011-11-07 Multi-Stage Fracture 2054.90 2055.00 0
2011-11-08 Multi-Stage Fracture 1995.00 1995.10 0
2011-11-06 Multi-Stage Fracture 2914.40 2914.50 0
2011-11-08 Multi-Stage Fracture 1935.20 1935.30 0
2011-11-08 Multi-Stage Fracture 1879.10 1879.20 0
2011-11-08 Multi-Stage Fracture 1829.00 1829.10 0
2011-11-08 Multi-Stage Fracture 1769.20 1769.30 0
2011-11-08 Multi-Stage Fracture 1721.00 1721.10 0
2011-11-08 Multi-Stage Fracture 1661.10 1661.20 0
2014-03-10 Acid Treatment 3009.00 3009.10 0
2014-03-10 Acid Treatment 2914.40 2914.50 0
2014-03-10 Acid Treatment 2868.80 2868.90 0
2014-03-10 Acid Treatment 2809.60 2809.70 0
2011-11-06 Multi-Stage Fracture 2868.80 2868.90 0
2014-03-10 Acid Treatment 2749.80 2749.90 0
2014-03-10 Acid Treatment 2689.90 2690.00 0
2014-03-10 Acid Treatment 2627.00 2627.10 0
2014-03-10 Acid Treatment 2580.70 2580.80 0
2014-03-10 Acid Treatment 2520.80 2520.90 0
2014-03-10 Acid Treatment 2474.50 2474.60 0
2014-03-10 Acid Treatment 2414.60 2414.70 0
2014-03-10 Acid Treatment 2367.60 2367.70 0
2014-03-10 Acid Treatment 2308.20 2308.30 0
2014-03-10 Acid Treatment 2262.70 2262.80 0
2011-11-06 Multi-Stage Fracture 2809.60 2809.70 0
2014-03-10 Acid Treatment 2203.40 2203.50 0
2014-03-10 Acid Treatment 2153.90 2154.00 0
2014-03-10 Acid Treatment 2104.40 2104.50 0
2014-03-10 Acid Treatment 2054.90 2055.00 0
2014-03-10 Acid Treatment 1995.00 1995.10 0
2014-03-10 Acid Treatment 1935.20 1935.30 0
2014-03-10 Acid Treatment 1879.10 1879.20 0
2014-03-10 Acid Treatment 1829.00 1829.10 0
2014-03-10 Acid Treatment 1769.20 1769.30 0
2014-03-10 Acid Treatment 1721.00 1721.10 0
2011-11-06 Multi-Stage Fracture 2749.80 2749.90 0
2014-03-10 Acid Treatment 1661.10 1661.20 0
2011-11-06 Multi-Stage Fracture 2689.90 2690.00 0
2011-11-07 Multi-Stage Fracture 2627.00 2627.10 0
2011-11-07 Multi-Stage Fracture 2580.70 2580.80 0
2011-11-07 Multi-Stage Fracture 2520.80 2520.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 547 0.0 0.0 0.0
2012 8156 0.0 0.0 0.0
2013 7754 0.0 0.0 0.0
2014 7981 0.0 0.0 0.0
2015 8586 0.0 0.0 0.0
2016 8566 0.0 0.0 0.0
2017 8303 0.0 0.0 0.0
2018 8481 0.0 0.0 0.0
2019 7234 0.0 0.0 0.0
2020 1471 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References