If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875111304002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.538284,"lon":-115.593595,"icon":""}]} |
Location: 00/04-13-087-11W5/2 | |
Location Alias: 00/04-13-87-11 W5M | |
Location Alias 2: 00/04-13-087-11 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 11 | |
Section: 13 | |
County/Municipality: Northern Sunrise County | |
Well Name: PPR (4-13) EVI 4-18-87-10 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0440832 | |
License Date: 2011-12-09 | |
License Status: Amended | |
Spud Date: 2012-01-09 | |
Final Drill Date: 2012-01-27 | |
Well Total Depth: 3016.00 m | |
Surface Hole Latitude: 56.538284 | |
Surface Hole Longitude: -115.593595 |
Date | Event |
---|---|
2011-12-09 | Obtained License |
2012-01-13 | Direction Drilling Operation Performed - Horizontal |
2012-01-22 | Well Log Performed |
2012-01-27 | Finished Drilling |
2012-01-27 | Well Log Performed |
2012-01-27 | Well Mode changed to Drilled and Cased |
2012-01-29 | Production Casing Operation Performed |
2012-01-30 | Rig Released |
2012-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-19 | Well Began Production |
2012-02-19 | Well Fluid changed to Crude Oil |
2012-02-19 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-13 | 1184.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-07 | Multi-Stage Fracture | 2991.30 | 2991.40 | 0 |
2012-02-08 | Multi-Stage Fracture | 2487.70 | 2487.80 | 0 |
2012-02-08 | Multi-Stage Fracture | 2436.90 | 2437.00 | 0 |
2012-02-08 | Multi-Stage Fracture | 2377.50 | 2377.60 | 0 |
2012-02-08 | Multi-Stage Fracture | 2318.70 | 2318.80 | 0 |
2012-02-08 | Multi-Stage Fracture | 2269.10 | 2269.20 | 0 |
2012-02-09 | Multi-Stage Fracture | 2210.20 | 2210.30 | 0 |
2012-02-09 | Multi-Stage Fracture | 2150.90 | 2151.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 2091.50 | 2091.60 | 0 |
2012-02-09 | Multi-Stage Fracture | 2041.90 | 2042.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 1983.30 | 1983.40 | 0 |
2012-02-07 | Multi-Stage Fracture | 2945.20 | 2945.30 | 0 |
2012-02-09 | Multi-Stage Fracture | 1924.50 | 1924.60 | 0 |
2012-02-09 | Multi-Stage Fracture | 1864.90 | 1865.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 1815.40 | 1815.50 | 0 |
2012-02-10 | Multi-Stage Fracture | 1756.30 | 1756.40 | 0 |
2012-02-10 | Multi-Stage Fracture | 1697.60 | 1697.70 | 0 |
2012-02-10 | Multi-Stage Fracture | 1638.20 | 1638.30 | 0 |
2012-02-07 | Multi-Stage Fracture | 2885.60 | 2885.70 | 0 |
2012-02-07 | Multi-Stage Fracture | 2834.80 | 2834.90 | 0 |
2012-02-07 | Multi-Stage Fracture | 2775.20 | 2775.30 | 0 |
2012-02-08 | Multi-Stage Fracture | 2715.60 | 2715.70 | 0 |
2012-02-08 | Multi-Stage Fracture | 2657.50 | 2657.60 | 0 |
2012-02-08 | Multi-Stage Fracture | 2606.50 | 2606.60 | 0 |
2012-02-08 | Multi-Stage Fracture | 2547.10 | 2547.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7028 | 0.0 | 0.0 | 0.0 |
2013 | 7497 | 0.0 | 0.0 | 0.0 |
2014 | 8515 | 0.0 | 0.0 | 0.0 |
2015 | 8599 | 0.0 | 0.0 | 0.0 |
2016 | 8153 | 0.0 | 0.0 | 0.0 |
2017 | 6309 | 0.0 | 0.0 | 0.0 |
2018 | 5756 | 0.0 | 0.0 | 0.0 |
2019 | 5667 | 0.0 | 0.0 | 0.0 |
2020 | 1390 | 0.0 | 0.0 | 0.0 |
For data sources see[6]