X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875101301020

Well Details

Well ID: 0875101301020
Loading map...
Location: 02/01-13-087-10W5/0
Location Alias: 02/01-13-87-10 W5M
Location Alias 2: 02/01-13-087-10 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 10
Section: 13
County/Municipality: Northern Sunrise County
Well Name: PPR 102 LOON 1-13-87-10
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0447685
License Date: 2012-08-10
License Status: Suspension
Spud Date: 2012-10-07
Final Drill Date: 2012-10-22
Well Total Depth: 3184.00 m
Surface Hole Latitude: 56.540843
Surface Hole Longitude: -115.472685

For data sources see[1][2]

Well History

Date Event
2012-08-10 Obtained License
2012-10-08 Surface Casing Operation Performed
2012-10-14 Direction Drilling Operation Performed - Horizontal
2012-10-22 Finished Drilling
2012-10-22 Well Mode changed to Drilled and Cased
2012-10-26 Production Casing Operation Performed
2012-10-26 Rig Released
2012-11-09 Well Log Performed
2012-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-04 Well Began Production
2012-12-04 Well Fluid changed to Crude Oil
2012-12-04 Well Mode changed to Pumping
2019-10-05 Well Fluid changed to Crude Oil
2019-10-05 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-07 Precision Drilling Corporation 327 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-14 1591.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-13 Multi-Stage Fracture 3150.30 3150.40 0
2012-11-14 Multi-Stage Fracture 2516.60 2516.70 0
2012-11-14 Multi-Stage Fracture 2458.90 2459.00 0
2012-11-14 Multi-Stage Fracture 2401.40 2401.50 0
2012-11-14 Multi-Stage Fracture 2262.80 2262.90 0
2012-11-14 Multi-Stage Fracture 2191.80 2191.90 0
2012-11-14 Multi-Stage Fracture 2093.90 2094.00 0
2012-11-14 Multi-Stage Fracture 2036.30 2036.40 0
2012-11-14 Multi-Stage Fracture 1975.20 1975.30 0
2012-11-14 Multi-Stage Fracture 1914.50 1914.60 0
2012-11-14 Multi-Stage Fracture 1854.10 1854.20 0
2012-11-13 Multi-Stage Fracture 3107.40 3107.50 0
2012-11-14 Multi-Stage Fracture 1791.30 1791.40 0
2012-11-13 Multi-Stage Fracture 3022.80 3022.90 0
2012-11-13 Multi-Stage Fracture 2949.80 2949.90 0
2012-11-13 Multi-Stage Fracture 2878.60 2878.70 0
2012-11-14 Multi-Stage Fracture 2807.70 2807.80 0
2012-11-14 Multi-Stage Fracture 2736.70 2736.80 0
2012-11-14 Multi-Stage Fracture 2625.00 2625.10 0
2012-11-14 Multi-Stage Fracture 2568.10 2568.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 630 0.0 0.0 0.0
2013 6523 0.0 0.0 0.0
2014 7522 0.0 0.0 0.0
2015 8180 0.0 0.0 0.0
2016 8251 0.0 0.0 0.0
2017 7009 0.0 0.0 0.0
2018 4377 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-26 No Incident Encountered 0.00 0.00
2012-11-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References