X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875093603000

Well Details

Well ID: 0875093603000
Loading map...
Location: 00/03-36-087-09W5/0
Location Alias: 00/03-36-87-09 W5M
Location Alias 2: 00/03-36-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 36
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 3-36-87-9
Operator Name: Surge Energy Inc.
License Number: 0417775
License Date: 2010-01-22
License Status: Amended
Spud Date: 2010-02-21
Final Drill Date: 2010-03-21
Well Total Depth: 2620.00 m
Surface Hole Latitude: 56.595843
Surface Hole Longitude: -115.299091

For data sources see[1][2]

Well History

Date Event
2010-01-22 Obtained License
2010-02-22 Water Flow Occurred
2010-03-01 Surface Casing Operation Performed
2010-03-04 Lost Circulation Occurred
2010-03-10 Intermediate Casing Operation Performed
2010-03-12 Direction Drilling Operation Performed - Horizontal
2010-03-15 Well Log Performed
2010-03-16 Intermediate Casing Operation Performed
2010-03-21 Finished Drilling
2010-03-21 Well Log Performed
2010-03-21 Well Mode changed to Drilled and Cased
2010-03-22 Well Log Performed
2010-03-23 Liner Casing Operation Performed
2010-03-24 Rig Released
2010-04-12 Well Log Performed
2010-04-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-04-13 Perforation Treatment Performed - Fractured
2010-05-14 Well Began Production
2010-05-14 Well Fluid changed to Crude Oil
2010-05-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-12 1010.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-13 Hydra Jet Perforation 2567.00 2567.10 1
2010-04-13 Fracture 2280.00 2280.10 0
2010-04-13 Hydra Jet Perforation 2215.00 2215.10 1
2010-04-13 Fracture 2215.00 2215.10 0
2010-04-13 Hydra Jet Perforation 2150.00 2150.10 1
2010-04-13 Fracture 2150.00 2150.10 0
2010-04-13 Hydra Jet Perforation 2105.00 2105.10 1
2010-04-13 Fracture 2105.00 2105.10 0
2010-04-13 Hydra Jet Perforation 2070.00 2070.10 1
2010-04-13 Fracture 2070.00 2070.10 0
2010-04-13 Hydra Jet Perforation 2020.00 2020.10 1
2010-04-13 Fracture 2567.00 2567.10 0
2010-04-13 Fracture 2020.00 2020.10 0
2010-04-13 Hydra Jet Perforation 1937.00 1937.10 1
2010-04-13 Fracture 1937.00 1937.10 0
2010-04-13 Hydra Jet Perforation 1725.00 1725.10 1
2010-04-13 Fracture 1725.00 1725.10 0
2010-04-13 Hydra Jet Perforation 1643.00 1643.10 1
2010-04-13 Fracture 1643.00 1643.10 0
2010-04-13 Hydra Jet Perforation 1565.00 1565.10 1
2010-04-13 Fracture 1565.00 1565.10 0
2010-04-13 Hydra Jet Perforation 1475.00 1475.10 1
2010-04-13 Hydra Jet Perforation 2485.00 2485.10 1
2010-04-13 Fracture 1475.00 1475.10 0
2010-04-13 Fracture 2485.00 2485.10 0
2010-04-13 Hydra Jet Perforation 2410.00 2410.10 1
2010-04-13 Fracture 2410.00 2410.10 0
2010-04-13 Hydra Jet Perforation 2335.00 2335.10 1
2010-04-13 Fracture 2335.00 2335.10 0
2010-04-13 Hydra Jet Perforation 2280.00 2280.10 1

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4685 0.0 0.0 0.0
2011 6866 0.0 0.0 0.0
2012 8483 0.0 0.0 0.0
2013 4576 0.0 0.0 0.0
2014 8118 0.0 0.0 0.0
2015 8719 0.0 0.0 0.0
2016 7743 0.0 0.0 0.0
2017 8579 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8340 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-22 Water Flow 128.00 128.00
2010-03-04 Lost Circulation 798.00 967.00

For data sources see[7]

References