X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875091408000

Well Details

Well ID: 0875091408000
Loading map...
Location: 00/08-14-087-09W5/0
Location Alias: 00/08-14-87-09 W5M
Location Alias 2: 00/08-14-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 14
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 8-14-87-9
Operator Name: Surge Energy Inc.
License Number: 0070081
License Date: 1978-06-09
License Status: Suspension
Spud Date: 1978-07-05
Final Drill Date: 1978-07-22
Well Total Depth: 1470.00 m
Surface Hole Latitude: 56.542771
Surface Hole Longitude: -115.308050

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-09 Obtained License
1978-07-05 Lost Circulation Occurred
1978-07-22 Finished Drilling
1978-07-22 Well Mode changed to Drilled and Cased
1978-07-24 Drill Stem Test Performed
1978-07-25 Drill Stem Test Performed
1978-07-26 Liner Casing Operation Performed
1978-08-02 Perforation Treatment Performed - Jet Perforation
1978-08-03 Well Began Production
1978-08-03 Well Fluid changed to Crude Oil
1978-08-03 Well Mode changed to Pumping
1989-10-02 Well Fluid changed to Crude Oil
1989-10-02 Well Mode changed to Suspended
1999-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-30 Perforation Treatment Performed - Jet Perforation
1999-10-30 Plug Back Performed
1999-10-30 Well Log Performed
1999-10-31 Well Log Performed
1999-11-01 Perforation Treatment Performed - Acid Wash - No Pressure
1999-11-04 Perforation Treatment Performed - Fractured
1999-11-14 Well Fluid changed to Crude Oil
1999-11-14 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-02 Perforation 1437.00 1437.50 13
1999-10-30 Packing Device Capped w/Cement 1424.00 1432.00 0
1999-10-30 Perforation 1314.00 1316.00 20
1999-11-01 Acid Wash 1314.00 1316.00 0
1999-11-04 Fracture 1314.00 1316.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2625 0.0 0.0 0.0
1979 8227 0.0 0.0 0.0
1980 8322 0.0 0.0 0.0
1981 7821 0.0 0.0 0.0
1982 7146 0.0 0.0 0.0
1983 8390 0.0 0.0 0.0
1984 7666 0.0 0.0 0.0
1985 8701 0.0 0.0 0.0
1986 8722 0.0 0.0 0.0
1987 8439 0.0 0.0 0.0
1988 8094 0.0 0.0 0.0
1989 6342 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-05 Lost Circulation 22.00 147.00

For data sources see[6]

References