X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875083105002

Well Details

Well ID: 0875083105002
Loading map...
Location: 00/05-31-087-08W5/2
Location Alias: 00/05-31-87-08 W5M
Location Alias 2: 00/05-31-087-08 W5/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 31
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 5-31-87-8
Operator Name: Surge Energy Inc.
License Number: 0044666
License Date: 1972-12-29
License Status: Suspension
Spud Date: 1973-01-08
Final Drill Date: 1973-01-21
Well Total Depth: 1438.70 m
Surface Hole Latitude: 56.586149
Surface Hole Longitude: -115.273975

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-21 Finished Drilling
1973-01-21 Well Mode changed to Drilled and Cased
1973-01-23 Production Casing Operation Performed
1973-01-30 Perforation Treatment Performed - Jet Perforation
1980-07-09 Perforation Treatment Performed - Jet Perforation
1982-02-23 Perforation Treatment Performed - Chemical Squeeze
1989-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-17 Perforation Treatment Performed - Chemical Squeeze
1992-01-17 Perforation Treatment Performed - Jet Perforation
1992-01-17 Well Log Performed
1992-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-11 Perforation Treatment Performed - Jet Perforation
2010-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-30 Perforation 1423.40 1426.60 13
2010-03-11 Perforation 1423.00 1426.60 17
2010-03-12 Acid Treatment 1287.40 1304.50 0
2010-03-12 Acid Treatment 1423.00 1426.60 0
1980-07-09 Perforation 1423.30 1426.60 7
1982-02-23 Chemical Squeeze 1423.30 1426.60 0
1989-02-28 Acid Treatment 1423.40 1426.80 0
1992-01-17 Chemical Squeeze 1423.30 1426.60 0
1992-01-17 Perforation 1423.30 1426.60 17
1992-01-20 Acid Treatment 1423.30 1426.60 0
2010-03-11 Perforation 1287.40 1289.30 17
2010-03-11 Perforation 1301.50 1304.50 17

For data sources see[4]



References