If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875082204022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.567017,"lon":-115.194234,"icon":""}]} |
Location: 02/04-22-087-08W5/2 | |
Location Alias: 02/04-22-87-08 W5M | |
Location Alias 2: 02/04-22-087-08 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 08 | |
Section: 22 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: MBOG REDEARTH 4-22-87-8 | |
Operator Name: Surge Energy Inc. | |
License Number: 0431989 | |
License Date: 2011-03-01 | |
License Status: Amended | |
Spud Date: 2011-07-06 | |
Final Drill Date: 2011-08-06 | |
Well Total Depth: 2813.00 m | |
Surface Hole Latitude: 56.567017 | |
Surface Hole Longitude: -115.194234 |
Date | Event |
---|---|
2011-03-01 | Obtained License |
2011-07-10 | Surface Casing Operation Performed |
2011-07-15 | Intermediate Casing Operation Performed |
2011-07-16 | Direction Drilling Operation Performed - Horizontal |
2011-07-19 | Intermediate Casing Operation Performed |
2011-07-31 | Direction Drilling Operation Performed - Horizontal |
2011-08-06 | Finished Drilling |
2011-08-06 | Well Log Performed |
2011-08-06 | Well Mode changed to Drilled and Cased |
2011-08-09 | Liner Casing Operation Performed |
2011-08-10 | Rig Released |
2011-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-03 | Well Began Production |
2011-10-03 | Well Fluid changed to Crude Oil |
2011-10-03 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-16 | 1099.00 | Horizontal |
2011-07-31 | 1447.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-20 | Open Hole/Barefoot Completion | 2802.30 | 2813.00 | 0 |
2011-09-21 | Multi-Stage Fracture | 2325.40 | 2325.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2264.90 | 2265.30 | 0 |
2011-09-21 | Multi-Stage Fracture | 2204.20 | 2204.60 | 0 |
2011-09-21 | Multi-Stage Fracture | 2156.90 | 2157.30 | 0 |
2011-09-21 | Multi-Stage Fracture | 2096.20 | 2096.60 | 0 |
2011-09-21 | Multi-Stage Fracture | 2035.50 | 2035.90 | 0 |
2011-09-22 | Multi-Stage Fracture | 1974.90 | 1975.30 | 0 |
2011-09-22 | Multi-Stage Fracture | 1927.20 | 1927.60 | 0 |
2011-09-22 | Multi-Stage Fracture | 1865.20 | 1865.60 | 0 |
2011-09-22 | Multi-Stage Fracture | 1803.30 | 1803.70 | 0 |
2011-09-20 | Multi-Stage Fracture | 2784.00 | 2784.20 | 0 |
2011-09-22 | Multi-Stage Fracture | 1755.00 | 1755.40 | 0 |
2011-09-22 | Multi-Stage Fracture | 1693.00 | 1693.40 | 0 |
2011-09-20 | Multi-Stage Fracture | 2723.40 | 2723.80 | 0 |
2011-09-20 | Multi-Stage Fracture | 2662.80 | 2663.20 | 0 |
2011-09-20 | Multi-Stage Fracture | 2602.10 | 2602.50 | 0 |
2011-09-20 | Multi-Stage Fracture | 2554.80 | 2555.20 | 0 |
2011-09-21 | Multi-Stage Fracture | 2494.10 | 2494.50 | 0 |
2011-09-21 | Multi-Stage Fracture | 2433.40 | 2433.80 | 0 |
2011-09-21 | Multi-Stage Fracture | 2372.80 | 2373.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1638 | 0.0 | 0.0 | 0.0 |
2012 | 8067 | 0.0 | 0.0 | 0.0 |
2013 | 5465 | 0.0 | 0.0 | 0.0 |
2014 | 8500 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8502 | 0.0 | 0.0 | 0.0 |
2017 | 8584 | 0.0 | 0.0 | 0.0 |
2018 | 8712 | 0.0 | 0.0 | 0.0 |
2019 | 7383 | 0.0 | 0.0 | 0.0 |
2020 | 1090 | 0.0 | 0.0 | 0.0 |
For data sources see[6]