X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875082204022

Well Details

Well ID: 0875082204022
Loading map...
Location: 02/04-22-087-08W5/2
Location Alias: 02/04-22-87-08 W5M
Location Alias 2: 02/04-22-087-08 W5/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-22-87-8
Operator Name: Surge Energy Inc.
License Number: 0431989
License Date: 2011-03-01
License Status: Amended
Spud Date: 2011-07-06
Final Drill Date: 2011-08-06
Well Total Depth: 2813.00 m
Surface Hole Latitude: 56.567017
Surface Hole Longitude: -115.194234

For data sources see[1][2]

Well History

Date Event
2011-03-01 Obtained License
2011-07-10 Surface Casing Operation Performed
2011-07-15 Intermediate Casing Operation Performed
2011-07-16 Direction Drilling Operation Performed - Horizontal
2011-07-19 Intermediate Casing Operation Performed
2011-07-31 Direction Drilling Operation Performed - Horizontal
2011-08-06 Finished Drilling
2011-08-06 Well Log Performed
2011-08-06 Well Mode changed to Drilled and Cased
2011-08-09 Liner Casing Operation Performed
2011-08-10 Rig Released
2011-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-20 Perforation Treatment Performed - Open-Hole Completion
2011-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-03 Well Began Production
2011-10-03 Well Fluid changed to Crude Oil
2011-10-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-16 1099.00 Horizontal
2011-07-31 1447.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-20 Open Hole/Barefoot Completion 2802.30 2813.00 0
2011-09-21 Multi-Stage Fracture 2325.40 2325.80 0
2011-09-21 Multi-Stage Fracture 2264.90 2265.30 0
2011-09-21 Multi-Stage Fracture 2204.20 2204.60 0
2011-09-21 Multi-Stage Fracture 2156.90 2157.30 0
2011-09-21 Multi-Stage Fracture 2096.20 2096.60 0
2011-09-21 Multi-Stage Fracture 2035.50 2035.90 0
2011-09-22 Multi-Stage Fracture 1974.90 1975.30 0
2011-09-22 Multi-Stage Fracture 1927.20 1927.60 0
2011-09-22 Multi-Stage Fracture 1865.20 1865.60 0
2011-09-22 Multi-Stage Fracture 1803.30 1803.70 0
2011-09-20 Multi-Stage Fracture 2784.00 2784.20 0
2011-09-22 Multi-Stage Fracture 1755.00 1755.40 0
2011-09-22 Multi-Stage Fracture 1693.00 1693.40 0
2011-09-20 Multi-Stage Fracture 2723.40 2723.80 0
2011-09-20 Multi-Stage Fracture 2662.80 2663.20 0
2011-09-20 Multi-Stage Fracture 2602.10 2602.50 0
2011-09-20 Multi-Stage Fracture 2554.80 2555.20 0
2011-09-21 Multi-Stage Fracture 2494.10 2494.50 0
2011-09-21 Multi-Stage Fracture 2433.40 2433.80 0
2011-09-21 Multi-Stage Fracture 2372.80 2373.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1638 0.0 0.0 0.0
2012 8067 0.0 0.0 0.0
2013 5465 0.0 0.0 0.0
2014 8500 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8502 0.0 0.0 0.0
2017 8584 0.0 0.0 0.0
2018 8712 0.0 0.0 0.0
2019 7383 0.0 0.0 0.0
2020 1090 0.0 0.0 0.0

For data sources see[6]

References