X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875071805000

Well Details

Well ID: 0875071805000
Loading map...
Location: 00/05-18-087-07W5/0
Location Alias: 00/05-18-87-07 W5M
Location Alias 2: 00/05-18-087-07 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 07
Section: 18
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 5-18-87-7
Operator Name: Surge Energy Inc.
License Number: 0273434
License Date: 2002-09-05
License Status: Suspension
Spud Date: 2002-09-16
Final Drill Date: 2002-09-29
Well Total Depth: 1519.00 m
Surface Hole Latitude: 56.543667
Surface Hole Longitude: -115.112162

For data sources see[1][2]

Well History

Date Event
2002-09-05 Obtained License
2002-09-18 Surface Casing Operation Performed
2002-09-19 Lost Circulation Occurred
2002-09-29 Finished Drilling
2002-09-29 Well Log Performed
2002-09-30 Drill Stem Test Performed
2002-10-02 Production Casing Operation Performed
2002-10-02 Rig Released
2002-10-02 Well Mode changed to Drilled and Cased
2002-10-10 Well Log Performed
2002-10-11 Perforation Treatment Performed - Jet Perforation
2002-10-11 Well Log Performed
2002-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-04 Well Began Production
2002-11-04 Well Fluid changed to Crude Oil
2002-11-04 Well Mode changed to Pumping
2002-12-13 Well Log Performed
2005-07-01 Well Fluid changed to Crude Oil
2005-07-01 Well Mode changed to Suspended
2015-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-01-25 Plug Back Performed
2015-01-25 Well Fluid changed to Crude Oil
2015-01-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-11 Perforation 1479.60 1480.80 17
2002-10-11 Perforation 1481.50 1483.00 17
2002-10-11 Perforation 1484.50 1485.50 17
2002-10-11 Perforation 1487.00 1488.30 17
2002-10-15 Acid Treatment 1479.60 1488.30 0
2015-01-25 Packing Device Capped w/Cement 1463.00 1472.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1360 0.0 0.0 0.0
2003 4309 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-09-19 Lost Circulation 505.00 1100.00
2015-01-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References