If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866132102020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.473244,"lon":-119.987184,"icon":""}]} |
Location: 02/02-21-086-13W6/0 | |
Location Alias: 02/02-21-86-13 W6M | |
Location Alias 2: 02/02-21-086-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 13 | |
Section: 21 | |
County/Municipality: Clear Hills County | |
Well Name: EEL BDYLKS 2-21-86-13 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0436098 | |
License Date: 2011-08-17 | |
License Status: Issued | |
Spud Date: 2011-08-19 | |
Final Drill Date: 2011-09-02 | |
Well Total Depth: 2147.00 m | |
Surface Hole Latitude: 56.473244 | |
Surface Hole Longitude: -119.987184 |
Date | Event |
---|---|
2011-08-17 | Obtained License |
2011-08-19 | Well Log Performed |
2011-08-20 | Surface Casing Operation Performed |
2011-08-23 | Direction Drilling Operation Performed - Horizontal |
2011-08-30 | Intermediate Casing Operation Performed |
2011-09-02 | Finished Drilling |
2011-09-02 | Well Log Performed |
2011-09-02 | Well Mode changed to Drilled and Cased |
2011-09-03 | Liner Casing Operation Performed |
2011-09-05 | Rig Released |
2011-09-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-28 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-31 | Well Began Production |
2011-10-31 | Well Fluid changed to Crude Oil |
2011-10-31 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-23 | 1220.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-28 | Multi-Stage Fracture | 1539.20 | 1539.30 | 0 |
2011-09-28 | Open Hole/Barefoot Completion | 2142.00 | 2147.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 1539.20 | 1540.20 | 0 |
2011-09-28 | Multi-Stage Fracture | 1608.70 | 1609.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 1678.30 | 1679.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 1747.20 | 1748.20 | 0 |
2011-09-28 | Multi-Stage Fracture | 1814.60 | 1814.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 1882.00 | 1883.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 1950.00 | 1951.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 2018.30 | 2019.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 2106.30 | 2107.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 1608.70 | 1608.80 | 0 |
2011-09-28 | Multi-Stage Fracture | 2106.40 | 2107.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 2018.30 | 2019.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 1950.10 | 1951.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 1882.10 | 1883.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 1814.60 | 1815.50 | 0 |
2011-09-28 | Multi-Stage Fracture | 1747.20 | 1748.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 1678.30 | 1679.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 1608.70 | 1609.80 | 0 |
2011-09-28 | Multi-Stage Fracture | 1539.20 | 1540.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 1678.30 | 1678.40 | 0 |
2011-09-28 | Multi-Stage Fracture | 1747.20 | 1747.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 1841.60 | 1841.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 1882.10 | 1882.20 | 0 |
2011-09-28 | Multi-Stage Fracture | 1950.10 | 1950.20 | 0 |
2011-09-28 | Multi-Stage Fracture | 2018.40 | 2018.50 | 0 |
2011-09-28 | Multi-Stage Fracture | 2106.40 | 2106.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1365 | 0.0 | 0.0 | 0.0 |
2012 | 7521 | 0.0 | 0.0 | 0.0 |
2013 | 8149 | 0.0 | 0.0 | 0.0 |
2014 | 7882 | 0.0 | 0.0 | 0.0 |
2015 | 8331 | 0.0 | 0.0 | 0.0 |
2016 | 7256 | 0.0 | 0.0 | 0.0 |
2017 | 8121 | 0.0 | 0.0 | 0.0 |
2018 | 8280 | 0.0 | 0.0 | 0.0 |
2019 | 8627 | 0.0 | 0.0 | 0.0 |
2020 | 2075 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-10-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]